Laserfiche WebLink
Alternatives to the <br />City of Santa Ana - Park View at Town and Country Manor <br />Draft EIR <br />be reasonably identified, whose implementation is remote or speculative, and that would not achieve <br />the basic project objectives. <br />An EIR must identify the Environmentally Superior Alternative to the proposed project. The <br />Environmentally Superior Alternative is the one that would result in the fewest or least significant <br />environmental impacts. If the Environmentally Superior Alternative that is identified is the No <br />Project Alternative, then an Environmentally Superior Alternative must be selected from the <br />remaining alternatives. Section 5.7 identifies and discusses the Environmentally Superior <br />Alternative. Section 5.8 includes two tables, Table 5 -1 comparing the impacts of the alternatives, and <br />Table 5 -2 identifying the feasibility of each project objective by alternative. <br />5.2 - Project Objectives <br />As stated in Section 3.3 Project Objectives, the objectives of the proposed project are to: <br />• Respond to the need for active adult and senior housing opportunities within the City of Santa <br />Ana by providing a senior residential living facility. <br />• Complete development of the Town and Country Manor in a cohesive manner, aesthetically <br />and operationally integrating the individual existing and proposed development components. <br />• Maximize utilization for residential development of the southwest corner of the Town and <br />Country Manor campus adjacent to the existing District Center area along Main Street, joining <br />together with Main Place Mall and City Place development to form a master planned mixed <br />use area. <br />• Add to existing development in the District Center land use area along Main Street with project <br />components that are compatible in scale and consistent with the architectural styles and <br />character of the area, and that provides a positive contribution to neighborhood identity. <br />• Develop the project site according to good urban design principles, acknowledging the <br />importance of the project as part of the City's North Main development corridor and District <br />Center land use area along Main Street, with proper attention to landscape design and planning <br />for pedestrian access. <br />• Maximize the advantages of the site's location close to Main Street in terms of its visibility and <br />proximity to the Garden Grove (SR -22) and Santa Ana (I -5) freeways. <br />• Provide a project that contributes to the continued revitalization of the northeastern part of the <br />City of Santa Ana. <br />5.3 -Alternatives Eliminated from Further Consideration <br />Initial areas of concern associated with the proposed project were aesthetics- shade /shadow, air <br />quality - construction, and traffic. The option of a 6 -story reduced intensity /reduced building height <br />5-2 Michael Brandman Associates <br />H \Cl t (PN- RN)b327b32]003MMVB2]0030 Sec05 Altematry .s <br />