Laserfiche WebLink
Alternatives to the <br />City of Santa Ana - Park View at Town and Country Manor <br />Draft EIR <br />remain. All project objectives of the planning effort would be achieved. The proposed project is <br />selected as the environmentally superior alternative. <br />5.8 - Summary Comparison of Project Alternatives <br />Table 5.1: Impact Summary Comparison of Project Alternatives with Proposed Project <br />Table 5 -2: Objective Feasibility Comparison <br />Project Alternative 1: No <br />Project/No Development <br />OBJ- 1.Respond to the need for Yes No <br />active adult and senior housing <br />opportunities within the City of <br />Santa Ana by providing a senior <br />residential living facility. <br />OBJ -2. Complete development of Yes No <br />the Town and Country Manor in a <br />cohesive manner, aesthetically and <br />operationally integrating the <br />individual existing and proposed <br />development components. <br />Alternative 2: No <br />Project/Development In <br />Accordance with Existing <br />Zoning and General Plan <br />Designations <br />Yes <br />Yes <br />OBJ3. Maximize utilization for Yes No No <br />residential development of the <br />southwest comer of the Town and <br />Country Manor campus adjacent to <br />the existing District Center area <br />along Main Street, joining together <br />with Main Place Mall and City <br />Place development to form a master <br />planned mixed use area. <br />5-10 Michael Bmndman Associates <br />H\Cl t" JN)b32]b32]003MMVB2]0030 Sec0 Altematrv.s <br />Alternative 2: No <br />Alternative 1: No Project /No <br />ProjectiDevelopmentln <br />Environmental Issue Proposed Project <br />Development <br />Accordance with Existing <br />Zoning and General Plan <br />Designations <br />Aesthetics LTS <br />L <br />L <br />Air Quality <br />LTS <br />L <br />L <br />Hydrology and Water Quality <br />LTS <br />E <br />L <br />Land Use and Planning <br />LTS <br />L <br />L <br />Noise <br />LTS <br />L <br />L <br />Transportation/Traffic <br />LTS <br />L <br />L <br />Utilities and Service Systems <br />LTS <br />L <br />L <br />Climate Change <br />LTS <br />L <br />L <br />= L esser impact than the proposed project. <br />= Equivalent impact to the proposed project. <br />r E <br />TS = Less than Significant. <br />Table 5 -2: Objective Feasibility Comparison <br />Project Alternative 1: No <br />Project/No Development <br />OBJ- 1.Respond to the need for Yes No <br />active adult and senior housing <br />opportunities within the City of <br />Santa Ana by providing a senior <br />residential living facility. <br />OBJ -2. Complete development of Yes No <br />the Town and Country Manor in a <br />cohesive manner, aesthetically and <br />operationally integrating the <br />individual existing and proposed <br />development components. <br />Alternative 2: No <br />Project/Development In <br />Accordance with Existing <br />Zoning and General Plan <br />Designations <br />Yes <br />Yes <br />OBJ3. Maximize utilization for Yes No No <br />residential development of the <br />southwest comer of the Town and <br />Country Manor campus adjacent to <br />the existing District Center area <br />along Main Street, joining together <br />with Main Place Mall and City <br />Place development to form a master <br />planned mixed use area. <br />5-10 Michael Bmndman Associates <br />H\Cl t" JN)b32]b32]003MMVB2]0030 Sec0 Altematrv.s <br />