Laserfiche WebLink
City of Santa Ana -Park View at Town and Country Manor <br />Draft EIR <br />• Section 5: Alternatives to the Proposed Project <br />• Section 6: Other CEQA Considerations <br />• Section 7: Persons and Organizations Consulted <br />• Section 8: List of Preparers <br />• Section 9: References <br />Introduction <br />• Appendices - Contains technical studies prepared to support the Draft FIR analysis. Any <br />technical studies or supporting technical appendices relating to the Park View at Town and <br />Country project not included in the Draft FIR Appendices are available for review at the City of <br />Santa Ana Planning and Building Agency, 20 Civic Center Plaza, Planning - 2nd Floor, Santa <br />Ana, California, 92702. <br />1.4 - Documents Incorporated by Reference <br />As permitted by § 15150 of the CEQA Guidelines, this Draft FIR has referenced several technical <br />studies, analyses, and previously certified environmental documentation. Information from the <br />documents, which have been incorporated by reference, has been briefly summarized in the <br />appropriate section(s). All documents utilized in the preparation of this Draft EIR are listed in <br />Section 9, References. In accordance with § 15150(b) of the CEQA Guidelines, these referenced <br />documents and other sources used in the preparation of the Draft FIR are available for review at the <br />City of Santa Ana Planning and Building Agency, 20 Civic Center Plaza/M -20, Santa Ana, <br />California, 92702. <br />1.5 - Documents Prepared for the Protect <br />Several technical studies, reports, and supporting documentation were prepared in order to address <br />environmental issues in this FIR. Most are included as technical appendices on a CD as part of this <br />Draft EIR. These appendices and all project documentation are available for review at the City of <br />Santa Ana Planning and Building Agency. <br />1.6 - Lead Agency, Sponsor, and Consultant <br />The City of Santa Ana is designated as the Lead Agency for the project. CEQA Guidelines § 15367 <br />defines the Lead Agency as "...the public agency, which has the principal responsibility for carrying <br />out or approving a project." Other public agencies may use this Draft FIR in the decision - making or <br />permit process and consider the information in this Draft FIR along with other information that may <br />be presented during the CEQA process. <br />This Draft FIR was prepared by Michael Brandman Associates (MBA), a consultant to the City of <br />Santa Ana. Technical studies prepared by other consultants have been reviewed for CEQA adequacy <br />by MBA. Prior to the public review of the Draft EIR, the Draft FIR was extensively reviewed and <br />Michael Brandman Associates 1 -9 <br />H\Cl t(PN- JMb327b32]003MMVB2]0030 Sec01-0OIvhadvctim dac <br />