Laserfiche WebLink
Site Plan Review No, 2014 -01 <br />Tentative Parcel Map No. 2014 -01 <br />May 12, 2014 <br />Page 7 <br />CEQA Analysis <br />In accordance with the California Environmental Quality Act (CEQA), the recommended actions have <br />been determined to be adequately evaluated in the previously certified EIR No. 06 -02 as per Section <br />15162 of the CEQA guidelines. All mitigation measures in EIR No. 06 -02 and associated Mitigation <br />Monitoring and Reporting Program (MMRP) requirements have been enforced and continue to apply <br />to the proposed project. As required by the MMPR, a circulation and air quality analysis were <br />performed to analyze any potential changes in either traffic or air quality as a result of the proposed <br />development. The studies concluded that no additional significant impacts that would trigger the <br />requirement for additional environmental review (Exhibits 14, 15 and 16). <br />Conclusion <br />Based on the analysis provided within this report, staff recommends that the Planning Commission <br />approve Site Plan Review No. 2014 -01 as conditioned and Tentative Parcel Map No. 2014 -01 as <br />conditioned. <br />Verny Carvajal _ <br />Senior Planner <br />VC :jm <br />v6repotls\HPR14.01TPM1401 DepatAtSantlago,pc <br />Attachments: <br />Exhibit 1— Vicinity Map <br />Exhibit 2 Land Use Map <br />Exhibit 3 — Photo Exhibit <br />Exhibit 4 — Ground Level Site Plan <br />Exhibit 5 — 2nd and 3rd Floor Plan <br />Exhibit 6 — 4th Floor Plan <br />Exhibit 7 — Podium Parking Plan <br />Exhibit 8 — Building 1 Elevations <br />Exhibit 9 — Building 2 Elevations (east/west) <br />Exhibit 10 — Building 2 Elevations (north /south) <br />Exhibit 11 — Street Level Elevations <br />Exhibit 12 Landscape and Hardscape Plan <br />Exhibit 13 — Tentative Parcel Map <br />Exhibit 14 — Mitigation Monitoring and Reporting Program (MMRP) <br />Exhibit 15 — Circulation Study <br />Exhibit 16 — Air Quality Analysis <br />75A -9 <br />