Laserfiche WebLink
RESOLUTION 2014 - # ## <br />REVENUE <br />$34.07 <br />ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br />SECTION IX PLANNING & BUILDING AGENCY <br />Projects prior to May 18, 2009, shall be subject to the fees indicated in Resolution 2009 -018 <br />51603 8) <br />Service Meters, Reset Meters, Subpanel, Switchboard, Motor <br />$171.58 <br />Control Canter, or similar equipment changes or additions. <br />$33.34 <br />599 volts or less, under 400 amps. <br />599 volts or less, 400 amps and less than 1200 amps. <br />598 volts or less, 1200 amps and over. <br />51603 9) <br />Signs and high - potential gas tube lighting, each <br />Note: This shall include all necessary control equipment <br />51603 10) <br />Swimming pool, fountain, spas, each <br />51603 l l) <br />Above ground spas <br />51603 12) <br />Temporary power- construction: <br />For services supplying a temporary power pole, <br />pedestal or piggyback <br />For a system of distribution and utilization of poles <br />for temporary construction power, each pole <br />51603 13) <br />Temporary construction lighting: <br />500 lamps or less <br />Over 500 lamps <br />51603 14) <br />'temporary services: <br />At the time of application for temporary power, the owner <br />shall post o $1,000,00 cash or cashier's check conforming to the <br />Santa Ana Municipal Code Section 8 -1768 for each service <br />meter. This deposit shall be released upon request after the <br />Certificate of Completion or Certificate of Occupancy Is issued. <br />Temporary Electrical Service, Prior to Approval <br />Or Occupancy (30 Days) <br />Temporary work with service, each meter <br />51603 15) <br />Lighting standards: <br />75B21 -66 <br />2.20 <br />FY 13 -14 FY 14 -15 <br />UNIT FEES FEES <br />Each Meter <br />$33.34 <br />$34.07 <br />Each Meter <br />$83.47 <br />$85.31 <br />Each Meter <br />$167.88 <br />$171.58 <br />Each <br />$33.34 <br />$34.07 <br />Each $73.72 $75.34 <br />Each $23.73 $24.26 <br />Each $57.96 $59.24 <br />Each Pole $11.01 $11.25 <br />$4.96 $5.07 <br />$8.66 $8.85 <br />Each Meter $210.54 $215.17 <br />Each Meter $29.32 $29.97 <br />