My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PALP INC. DBA EXCEL PAVING COMPANY
Clerk
>
Contracts / Agreements
>
PROJECTS
>
PALP INC. DBA EXCEL PAVING COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 9:26:39 AM
Creation date
6/18/2014 5:30:13 PM
Metadata
Fields
Template:
Contracts
Company Name
PALP INC. DBA EXCEL PAVING COMPANY
Contract #
Various
Agency
Public Works
Council Approval Date
6/17/2014
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number 08-1732: Grand Ave. Widening & Storm Drain From let to Change Order Number 1 <br />To Excel Paving Company Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER 15 NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE <br />1. Install streetlight conduit, pullboxes and foundations, and install City provided streetlight <br />service pedestal with foundation, poles and luminaires per streetlight plan BA01 dated <br />1/9/2015. (PCO #06) <br />AGREED PRICE $50,025.90 <br />2. Construct 24" RCP and cast -in-place reinforced concrete box on storm drain lateral "C per <br />revised detail dated 12/16/14. (PCO #011) <br />AGREED PRICE $53,560.00 <br />3. Provide and install new United Storm Water (USW) automatic retractable screens (ARS) and <br />connector pipe screens (CPS) at the three catch basins in lieu of the Contech Triton Inserts <br />shown on plan. (PCO #02) <br />AGREED PRICE $9,357.23 <br />EXTRA WORK AT TIME & MATERIAL <br />4. Construct 12" vertical offset in the 12" water main per City Standard 14138 at STA 10+14 on <br />a time and materials basis. (PCO #09) <br />FINAL COST $16,647.51 <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.