Cf r >( OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number 08-1732: Grand Ave. Widening & Storm Drain From 1St to Change order Number 2 <br />4th <br />To Excel Paving Company Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by <br />EXTRA WORK AT AGREED PRICE <br />PUBLIC WORKS AGENCY <br />1. Extend the 78" RCP 64 LF, construct a junction structure at the intersection of the existing 48" <br />RCP and eliminate the transition structure at STA 34+75 per revised sheets QA02 and DD02 <br />dated March 12, 2015. <br />AGREED COST = $ 98,440.00 <br />EXTRA WORK AT TIME & MATERIAL <br />2. Install 4" PVC conduit in lieu of reusing existing 3" conduit shown on plan as directed in PCO <br />#13. <br />ORIGINAL CONTRACT BID ITEM QUANTITY ADJUSTMENTS <br />B17 Furnish and Install Cast -in -Place EA (1.00) <br />Transition Structure (Double RCP <br />to Single RCB and Single RCP) <br />CHANGE ORDER COST SUMMARY <br />Increase $100,155.38 <br />Decrease ($69,000.00) <br />Net Increase to Contract $31,155.38 <br />Page 1 of 2 <br />FINAL COST $ 1,715.38 <br />($ 69,000.00) <br />