My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PALP INC. DBA EXCEL PAVING COMPANY
Clerk
>
Contracts / Agreements
>
PROJECTS
>
PALP INC. DBA EXCEL PAVING COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 9:26:39 AM
Creation date
6/18/2014 5:30:13 PM
Metadata
Fields
Template:
Contracts
Company Name
PALP INC. DBA EXCEL PAVING COMPANY
Contract #
Various
Agency
Public Works
Council Approval Date
6/17/2014
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cf r >( OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number 08-1732: Grand Ave. Widening & Storm Drain From 1St to Change order Number 2 <br />4th <br />To Excel Paving Company Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by <br />EXTRA WORK AT AGREED PRICE <br />PUBLIC WORKS AGENCY <br />1. Extend the 78" RCP 64 LF, construct a junction structure at the intersection of the existing 48" <br />RCP and eliminate the transition structure at STA 34+75 per revised sheets QA02 and DD02 <br />dated March 12, 2015. <br />AGREED COST = $ 98,440.00 <br />EXTRA WORK AT TIME & MATERIAL <br />2. Install 4" PVC conduit in lieu of reusing existing 3" conduit shown on plan as directed in PCO <br />#13. <br />ORIGINAL CONTRACT BID ITEM QUANTITY ADJUSTMENTS <br />B17 Furnish and Install Cast -in -Place EA (1.00) <br />Transition Structure (Double RCP <br />to Single RCB and Single RCP) <br />CHANGE ORDER COST SUMMARY <br />Increase $100,155.38 <br />Decrease ($69,000.00) <br />Net Increase to Contract $31,155.38 <br />Page 1 of 2 <br />FINAL COST $ 1,715.38 <br />($ 69,000.00) <br />
The URL can be used to link to this page
Your browser does not support the video tag.