ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase IIIB — Washington Avenue to 17' Street <br />circumstances has occurred. Only if one or more of the following circumstances arises is a Subsequent <br />EIR required, pursuant to CEQA Guidelines Section 15162: <br />(1) Substantial changes are proposed in the project which will require major revision of <br />the previous EIR due to the involvement of new significant environmental effects or <br />a substantial increase in the severity of previously identified significant effects; <br />(2) Substantial changes occur with respect to the circumstances under which the project <br />is undertaken which will require major revision of the previous EIR due to the <br />involvement of new significant environmental increase in the severity of previously <br />identified significant effects; or <br />(3) New information of substantial importance, which was not known and could not have <br />been known with the exercise of reasonable diligence at the time the previous EIR <br />was certified as complete, shows any of the following: <br />(A) The project will have one or more significant effects not discussed in the <br />previous EIR; <br />(B) Significant effects previously examined will be substantially more severe than <br />shown in the previous EIR; <br />(C) Mitigation measures or alternatives previously found not to be feasible would in <br />fact be feasible, and would substantially reduce one or more significant effects of <br />the project, but the project proponents decline to adopt the mitigation measure or <br />alternative; or <br />(D) Mitigation measures or alternatives which are considerably different from those <br />analyzed in the previous EIR would substantially reduce one or more significant <br />effects on the environment, but the project proponents decline to adopt the <br />mitigation measure or alternative. (CEQA Guidelines Section 15162[a]) <br />A Supplement to an EIR (or Supplemental EIR), which is narrower in scope than a Subsequent EIR, may <br />be prepared if any of the above criteria apply, but "[o]nly minor changes or additions would be necessary <br />to make the previous EIR adequately apply to the project in the changed situation" (CEQA Guidelines <br />Section 15163[a][2]). In the absence of the need to prepare either a Subsequent or Supplemental EIR, an <br />Addendum may be prepared. More specifically, CEQA Guidelines Section 15164 states: <br />(a) The lead agency or a responsible agency shall prepare an addendum to a previously <br />certified EIR if some changes or additions are necessary but none of the conditions <br />described in Section 15162 calling for preparation of a subsequent EIR have <br />occurred. <br />ANA 111 -334 (PER- 02 -01) CITY of SANTA ANA (11/25/2013 RPV2) 132897 CM PAGE 2 <br />55C -17 <br />