My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55C - RESO - BRISTOL ST IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
07/01/2014
>
55C - RESO - BRISTOL ST IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2014 3:34:35 PM
Creation date
6/26/2014 2:56:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55C
Date
7/1/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street Widening Phase I11B — Washington Avenue to 17`" Street <br />in significant impacts to air quality which would expose sensitive receptors to substantial air pollutant <br />concentrations. <br />Mitigation Measures <br />No additional new mitigation measures are required. <br />e.) Create objectionable odors affecting a substantial number of people? <br />Construction activities associated with the proposed Project may generate detectable odors from heavy - <br />duty construction equipment and exhaust. Odors associated with diesel and gasoline fames are transitory <br />in nature and would not create objectionable odors affecting a substantial number of people. The impacts <br />from these odors would be short -teen, would cease upon Project completion, and are not anticipated to be <br />significant. Implementation of the proposed Project would not result in greater impacts than previously <br />analyzed in the 1990 FEIS/EIR. <br />Mitigation Measures <br />No additional new mitigation measures are required. <br />3.4 Biological Resources <br />This section corresponds with Section IV - Environmental Consequences and Mitigation Measures, <br />Subsection E - Streambed Modification, of the previously approved 1990 FEIS/EIR. <br />a.) Have a substantial adverse effect, either directly or through habitat modifications, on any species <br />identified as a candidate, sensitive, or special - status species in local or regional plans, policies, or <br />regulations, or by the California Department of Fish and Game or US Fish and Wildlife Service? <br />The Project site is located within a highly urbanized area within the City of Santa Ana. No sensitive <br />natural habitat or special - status species exist on or in the vicinity of the proposed Project (Natural <br />Environment Study [Minimal Impacts], URS Corporation, April 2011). Implementation of the proposed <br />Project would not result in greater impacts than previously analyzed in the 1990 FEIS /EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />b.) Have a substantial adverse effect on any riparian habitat or other sensitive natural community <br />identified in local or regional plans, policies, or regulations or by the California Department of <br />Fish and Garne or US Fish and Wildlife Service? <br />Refer to response in 3.4 (a.), above. No riparian habitat or other sensitive natural communities are <br />identified in the Project area or vicinity. Implementation of the proposed Project would not result in <br />greater impacts than previously analyzed in the 1990 FEIS /EIR. <br />ANA 111 -334 (PER- 02 -01) CITY OF SANTA ANA (11/25/2013 REV2) 132897 CM <br />55C -43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.