Laserfiche WebLink
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase HIS — Washington Avenue to 17`b Street <br />4.0 REFERENCES <br />The following references were utilized for the preparation of this Addendum. <br />Basmaciyan- Darnell, Inc. 1985. Intercity Liaison Committee — Five -Year Transportation Study Update to <br />1990. <br />California Department of Transportation (Caltrans). 2012. Noise Study Report — Bristol Street Widening <br />Phase III Civic Center Drive to Seventeenth Street. March 2012. <br />Mohle, Grover & Associates. 1983. Bristol Street Corridor Study — Final Report. <br />Parsons, Brinkerhoff, Quade, and Douglas, Inc. 1983. Arterial Highway Element — Santa Ana Element — <br />Santa Ana Transportation Corridor State II Alternative Analysis. <br />Santa Ana, City of. 2010. City of Santa Ana General Plan. Adopted September 1982 (with updates and <br />reformatting through January 2010). <br />2013. City of Santa Ana Website: www.ei.santa- ana.ca.us. Accessed November 2013. <br />2013b. 17h St. at Bristol St. EB Right Turn Pocket Future LOS Calculation Memorandum. <br />November 25, 2013. <br />Southern California Association of Governments (SLAG). 2008. Orange County RTIP, Project Listing <br />Report. Accessed at: www.scag.ca.gov. <br />URS Corporation. 2010a. Traffic Impact Analysis — Bristol Street Widening Project Phase III Civic <br />Center Drive to Seventeenth Street. September 2010. <br />. 2010b. Community Impact Assessment — Bristol Street Widening Project Civic Center Drive to <br />Seventeenth Street (Phase III). October 2010. <br />. 201 la. Natural Environment Study (Minimal Impacts) — Bristol Street Widening Project Civic <br />Center Drive to Seventeenth Street (Phase III). April 2011. <br />. 201 lb. Final Relocation Impact Statement — Bristol Street Widening Project Civic Center Drive to <br />Seventeenth Street (Phase III). November 2011. <br />. 2012a. Historic Resources Evaluation Report — Bristol Street Widening Project Civic Center <br />Drive to Seventeenth Street (Phase 177). September 2012. <br />2012b. Air Quality Conformity Analysis — Bristol Street Widening Project Civic Center Drive to <br />17`h Street (Phase II1). November 2012. <br />. 2012c. Noise Study Report — Bristol Street Widening Project Civic Center Drive to 17`h Street <br />(Phase III). March 2012. <br />. 2013a. Air Quality Assessment Report— Bristol Street Widening Project Civic Center Drive to 17`h <br />Street (Phase III). January 2013. <br />ANA 111 -334 (PER-02-0t) CTTY OF SANTA ANA (11/25/2013 REV2) 132897 CM PAGE 54 <br />55C -69 <br />