Laserfiche WebLink
PROJECT NO. SNT•11,OE DATE June 17, 2014 <br />PROJECT NAME Harbor Boulevard Specific Plan <br />TYPE OF AUTHORIZATION: <br />❑ Fixed Price Project ❑ Time and Materials Project <br />® Contract Extension ❑ Meetings Extra to Contract <br />Relmbursables; ❑ No Charge ❑ Extra to Contract ® 10% Markup on Subconsultants <br />RETAINER: $ 0.00 ❑ Yes* ® No <br />*All retainers are either applied to the final Invoice or refunded at the close of the project. <br />BUDGET AMOUNT: <br />AGREEMENT BETWEEN: <br />® Not to Exceed ❑ Estimated <br />CLIENT <br />City of Santa Ana <br />CONSULTANT <br />PlaceWorks <br />STREET ADDRESS <br />20 Civic Center Plaza <br />STREET ADDRESS <br />3 MacArthur Place, Suite 1100 <br />CITYSTATE AND ZIP <br />Santa Ana, CA 92701 <br />CITY STATE AND ZIP <br />Santa Ana, CA 92707 <br />CONTACT <br />Sergio Koltz <br />CONTACT <br />Nicole Morse <br />Hereinafter referred to as "Client," <br />Hereinafter referred to as "Consultant." <br />This document authorizes the Consultant to execute the following services for the Client as Indicated below; <br />SCOPE AND DURATION OF SERVICES: <br />Task 1. Additional Scope and Cost for IBI/Sewer Analysis: <br />Duringthe EIR response to comments period OCSD requested additional modeling data on its,sewertrunk line. IBI will provide <br />sanitary flows atthe points of connection to the main sewer trunk llne, located in Newhope Street. The points of connection will <br />only be along the length of the project, Westminster Ave thru Edinger Ave. The sanitary flows will be based on full build out of the <br />project and will not address any possible ground water infiltration. OCSO will Inputthese flows in their model and provide the <br />resuitsfor IBI's review and discussion. This assumes there will be a maximum of two Iterations of the model required. Once an <br />acceptable model Is obtained, IN will modify the Sewer Studyto outline the results. <br />Cost = $6,750 <br />Task 2, Water Supply Assessment: <br />During the preparation of the DEIR, PlaceWorks prepared the Water Supply Assessment (WSA) in accordance with SB 610, which is <br />required for circulation of the DEIR. Preparation of the WSA was beyond the scope of the original contract. <br />Cost = $3,200 <br />3 MacArthur Place, Suite 1100 1 Santa Ana, California 92707 1 714.96&9220 ! PlaceWorks.com <br />r <br />