My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COAST SURVEYING, INC. 4 - 2014
Clerk
>
Contracts / Agreements
>
C
>
COAST SURVEYING, INC. 4 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 2:36:31 PM
Creation date
7/22/2014 11:42:34 AM
Metadata
Fields
Template:
Contracts
Company Name
COAST SURVEYING, INC.
Contract #
A-2014-101
Agency
PUBLIC WORKS
Council Approval Date
4/15/2014
Expiration Date
6/30/2016
Insurance Exp Date
9/18/2017
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Route 91 Freeway HOV - Route 55 to Riverside Bounty Line in Anaheim, & Yorba <br />Linda, California for the California Private Transportation Corp, thru Klewlt 817. <br />The scope of work Involved providing quality oontrol/quality assurance verification <br />surveys as needed for the construction of 10 miles of new privatized HOV toliways. The <br />project included numerous retaining walls & soundwalls, medlan paving, bridge <br />widening, major interchange redesign, detours, and all associated survey control <br />conventional and GPS. <br />Route 110 Freeway - Gardena Blvd, to Redondo Beach Blvd. in Los Angeles, <br />California for Caltrans - District 7. Work consisted of construction staking on the <br />Harbor Freeway from 0.1 mile north of Gardena Boulevard to Redondo Beach <br />Boulevard: marking 100 feet stations and B,C. and'E.C. points along freeway shoulder <br />and 100 feet stations along Redondo Beach Boulevard; marking rough cut line and <br />grade for retaining wall and soundwall footings; marking various saw cut lines; staking <br />for retaining walls, soundwalls, and drainage structures; cross-section existing cross <br />streets and freeway shoulder areas for quantity calculations; and miscellaneous <br />construction staking as required. <br />San Joaquin Hills Transportation Corridor State Route 73) in Orange Bounty, <br />California for the Transportation Corridor Agencies. Work consisted of: preparation <br />and/or review of legal descriptions and sketches, acreage calculations, and exhibits for <br />various properties; preparation and revision of constraints maps; review preliminary title <br />reports along with revisions or updates; provide fee credit acreage calculations and <br />exhibit maps; reviewing final policies of title and policy binders for accuracy of <br />descriptions; field reconnaissance with builders surveyor of all horizontal and vertical <br />control monumentation; maintain primary control network; staking the perimeters of no - <br />work or limited work areas designated as archaeological or biological resources; <br />providing oversight verification surveys as directed by the Construction Engineering <br />Manager (GEM) for bridges, structures, walls, drainage, slopes, and finished surfaces <br />as needed for the construction of 20 miles of new toliways. <br />Route 6/Route 55 Freeway Interchange with HOV Connectors in Tustin & Santa <br />Ana, California for Caltrans District 12 thru RBF Consultants. Work consisted of <br />Design Surveys as construction project proceeds which could be topographic surveys, <br />cross-sections, volume computations, utility locations, and other miscellaneous design <br />surveys. Work also consisted of Right -of -Way Surveys as follows: search for existing <br />right-of-way monumentation on Route 5 and on Route 55, tie monuments to control, <br />and tie monuments to be destroyed by construction to reference monuments; search for <br />existing centerline and right-of-way monuments on cross -streets and on side streets, tie <br />monuments to control, and tie monuments to be destroyed by construction to reference <br />monuments; after construction, reset monuments destroyed by construction; after <br />construction, set monuments at new right-of-way points of control; assist in preparation <br />of post -construction Survey Control Maps; and perform any centerline or boundary <br />surveys necessary for the preparation of Records of Surveys. <br />
The URL can be used to link to this page
Your browser does not support the video tag.