Laserfiche WebLink
vertical and horizontal control, photo control, GPS surveys, topographic surveys, design surveys, boundary <br />surveys, right of way surveys, and construction layout. Mr. Reiter is a Certified Party Chief and has been <br />Hazmat trained since 1986. <br />COAST SURVEYING, INC. <br />EXPERIENCE <br />METRO Major Projects, as Survey Party Chief one <br />Airport Metro Connector (LAX 5.4 sq, miles, aerial mapping, <br />Right -of -Way mapping, design topo. $374K in fees. <br />Downtown Los Angeles Streetcar Restoration through HDR, <br />Inc. The project is 3.8 miles long in the very dense and complex <br />area of Downtown LA. Due to the hundreds of high rise <br />buildings, Coast worked out an innovative flight plan to produce <br />an extremely excellent aerial mapping product. Work consisted <br />of performing control network, design surveys, aerial mapping, <br />and Right -of -Way mapping, <br />Union and Patsaouras Plaza Busway Station through STV, <br />Inc. Work consisted of performing design surveys, aerial <br />mapping, Right -of -Way mapping, property monumentation and <br />Record of Survey. <br />City of Ontario on Milliken Avenue Grade Separation at <br />UPRRIMetrolink/Mission Boulevard through Moffatt Nichol, <br />Engineers - Survey research, photo control, aerial <br />photogrammetric mapping, design surveys, centerline surveys, <br />and right of way delineation, <br />SANBAG on Palm Avenue Grade Separation at <br />BNSFNPRRICajon Boulevard in San Bernardino through <br />CI -12M Hill — Survey research, photo control, aerial <br />photogrammetric mapping, design surveys, centerline surveys, <br />and right of way delineation. <br />SCRRA on Orange County Service Expansion (60 Miles) & <br />Grade Crossings ihru J.L, Patterson & Assoc., as Survey <br />Party Chief, Coast has provided surveying and mapping <br />services. Work performed Included establishing control <br />monuments every 5 miles, and photo control targets, aerial <br />mapping, DTM and digital orthographic photography covering <br />a 600 -foot wide swath along the entire project length. Detalled <br />topographic surveys were made under all over crossing <br />structures and areas of proposed RR yards and maintenance <br />facilities. Precise H & V location data along the track was <br />obtained and horizontal alignment determined in areas of <br />concern. On 63 grade crossings, performed work included <br />construction control, topographic surveys and Right-of- <br />WaylBoundary surveys were also performed. <br />