My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COAST SURVEYING, INC. 4 - 2014
Clerk
>
Contracts / Agreements
>
C
>
COAST SURVEYING, INC. 4 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 2:36:31 PM
Creation date
7/22/2014 11:42:34 AM
Metadata
Fields
Template:
Contracts
Company Name
COAST SURVEYING, INC.
Contract #
A-2014-101
Agency
PUBLIC WORKS
Council Approval Date
4/15/2014
Expiration Date
6/30/2016
Insurance Exp Date
9/18/2017
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
vertical and horizontal control, photo control, GPS surveys, topographic surveys, design surveys, boundary <br />surveys, right of way surveys, and construction layout, <br />COAST SURVEYING, INC. <br />EXPERIENCE <br />SCRRA Orange County Service Expansion (60 Mlles) & <br />Grade Crossings thru J.L, Patterson & Assoo. -2005 to <br />2012, as a Chairman. Coast has and is providing surveying <br />and mapping services under J. L. Patterson & Associates for <br />SCRRA. This project begins at Fullerton Station and continues <br />southerly miles to the San Diego County line, Fullerton to <br />Atwood to Orange and various railroad yards. Work <br />performed included establishing control monuments every 5 <br />miles, and photo control targets, aerial mapping, DTM and <br />digital orthographic photography covering a 600 -foot wide <br />swath along the entire project length. Detailed topographic <br />surveys were made under all over crossing structures and <br />areas of proposed RR yards and maintenance facilities. <br />Precise H & V location data along the track was obtained and <br />horizontal alignment determined in areas of concern. On 53 <br />grade crossings, performed work included construction <br />control, topographic surveys and Right-of-Way/Boundary <br />surveys were also performed, <br />Airport Metro Connector through Connect LAX through <br />Connect LAX (PB and STV Joint Vonture) -2011 to present, as <br />a Chairman. The project is 2 square miles of very complex and <br />busy LAX. Work consisted of performing design surveys, aerial <br />mapping, Right -of -Way mapping. <br />Metro Downtown Los Angeles Streetcar Restoration through <br />HDR, Inc. -2011 to present, as a Chainman. The project Is 3.8 <br />miles long in the very dense and complex area of Downtown LA, <br />Due to the hundreds of high rise buildings, Work consisted of <br />performing control network, design surveys, aerial mapping, and <br />Right -of -Way mapping. <br />Metro Interstate -710 North Segment Utility Study through <br />MDR, Inc. -2012 to present, as a Chainman. The project is 8 <br />miles long. Work consisted of performing design surveys, aerial <br />mapping, Right -of -Way mapping. <br />Metro Soundwalls. Package 2 through CH2M Hill -2012 to <br />present, as a Chainman. The project was 5 miles long along the <br />SR 170. Work consisted of performing control network, mobile <br />scanning, pothole survey, aerial mapping and design surveys. <br />
The URL can be used to link to this page
Your browser does not support the video tag.