My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-2868 - VOTER MMD
Clerk
>
Ordinances
>
2011 - 2020 (NS-2813 - NS-3000)
>
2014 (NS-2857 - NS-2875)
>
NS-2868 - VOTER MMD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:15:41 PM
Creation date
7/24/2014 10:25:05 AM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c) Each collective and cooperative shall submit with its registration application a required <br />fee pursuant to this Article. <br />(d) As each collective and cooperative submits its registration application and fee pursuant to <br />this Article, the Director shall time -stamp the application with the date and time received. Seven <br />calendar days after the date the Director begins accepting applications, the Director shall stop <br />accepting applications and shall that day establish a priority list that identifies by name, address <br />date and time the order in which applications were received. The order in which applications <br />were received shall be the order in which the Director shall process them. A collective or <br />cooperative may only be assigned one place on the priority list, and multiple submissions will <br />result in immediate disqualification from the registration process. <br />(e) Within seven calendar days of establishing the priority list, the Director shall publish the <br />priority list on the City's website and once in a local daily newspaper of general circulation. <br />(f) The order set forth in the priority list shall remain in effect until the priority list has been <br />exhausted, at which time, should the number of current valid registrations fall below that <br />established by Sec. 18 -612 of this Article, a new date and time will be set for submission of <br />additional applications following the process set forth herein, but not more frequently than once <br />every 180 days. <br />(g) Following establishment of the priority list, the Director shall begin processing as a <br />ministerial duty the registration applications of collectives and cooperatives in the order <br />established by the priority list. The Director shall continue processing applications until the <br />maximum number of collective and cooperative registrations have been issued a Notice of <br />Completed Registration and placed on the registration list. This processing shall consist of <br />verification of the information required by Sec. 18 -615 as complete and accurate. <br />(h) No cooperative's or collective's rank on the priority list shall be assigned, transferred, or <br />sold. Any attempt to so assign, transfer, or sell a priority ranking shall render the application null <br />and void. Any person, collective, or cooperative attempting to o assign, transfer, or sell a priority <br />ranking and nd any person, collective, or cooperative attempting to o acquire a priority ranking <br />outside the provisions set forth herein shall be immediately disqualified from the registration <br />process for three years. <br />Sec. 18 -617. - Issuance and Renewal of Registration <br />(a) Upon the receipt of an application for registration, the Director shall, as a ministerial <br />duty, complete processing and issue a Notice of Completed registration and place the collective <br />or cooperative on the registration list within 30 calendar days, to be tolled if, and only ifs <br />requested by the applicant to allow processing time, ime, unless: <br />(1) The application is incomplete or inaccurate; or <br />
The URL can be used to link to this page
Your browser does not support the video tag.