My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BICKMORE & ASSOCIATES, INC.-2014
Clerk
>
Contracts / Agreements
>
B
>
BICKMORE & ASSOCIATES, INC.-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2015 1:00:28 PM
Creation date
7/25/2014 3:59:01 PM
Metadata
Fields
Template:
Contracts
Company Name
BICKMORE & ASSOCIATES, INC.
Contract #
N-2014-098
Agency
Finance & Management Services
Expiration Date
6/2/2015
Insurance Exp Date
12/15/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal to Provide Actuarial Valuation of OPEB Liabilities <br />For the City of Santa Ana <br />April 17, 2014 <br />9. Cost Informatiion <br />Bickmore offers the following actuarial services relating to the calculation of OPEB liabilities: <br />June 2014 Actuarial Valuation Report $ 14,800 <br />- Results will be presented based on the City's current funding policy for the fiscal years <br />ending June 30, 2014 and 2015. <br />- An illustration of prefunding results will be provided for one year to highlight potential <br />benefits of prefunding. <br />- The fee above also includes an in- person presentation of results to the City plus a <br />telephone conference to review the draft report (or alternatively, two telephone <br />conferences in lieu of an in- person presentation of results, at the City's option). <br />The chart below provides an estimate of approximate hours of each staff member for <br />this project: <br />Optional services: <br />Additional cost for sub -group analysis $ 300 per group <br />Additional in- person meetings 800 each <br />Preliminary results at various discount rates 300 for each additional rate illustrated <br />Actuarial forms required for CERBT filings 750 (if the City elects to join this trust) <br />We believe the services described above will meet the City's objectives for this project. We <br />do not anticipate any other work related to the valuation which could result in additional <br />charges, with the possible exception of the following: <br />Data: The basic valuation fee above includes up to 24 hours for analysis, <br />consolidation and organization of employee and plan data to prepare it for our <br />actuarial coding. This generally requires that data be provided to us in the <br />requested format (or other equally suitable format) with one line per employee. If <br />multiple worksheets are provided, a unique field should be present to allow us to <br />match records efficiently. Should the data require additional time to organize before <br />we can begin our valuation, we reserve the right to charge for this time at the <br />hourly rates shown below. <br />If benefits are significantly different than described to us. <br />• Consulting or actuarial projections relating to possible plan redesign. <br />Biickmore 2 <br />Estimated <br />Consultant_ <br />Hourly Rate <br />Hours <br />Senior Actuarial Consultants <br />$ 300 <br />24 <br />Actuarial Analysts <br />160 <br />45 <br />Administrative Staff <br />80 <br />4 <br />Optional services: <br />Additional cost for sub -group analysis $ 300 per group <br />Additional in- person meetings 800 each <br />Preliminary results at various discount rates 300 for each additional rate illustrated <br />Actuarial forms required for CERBT filings 750 (if the City elects to join this trust) <br />We believe the services described above will meet the City's objectives for this project. We <br />do not anticipate any other work related to the valuation which could result in additional <br />charges, with the possible exception of the following: <br />Data: The basic valuation fee above includes up to 24 hours for analysis, <br />consolidation and organization of employee and plan data to prepare it for our <br />actuarial coding. This generally requires that data be provided to us in the <br />requested format (or other equally suitable format) with one line per employee. If <br />multiple worksheets are provided, a unique field should be present to allow us to <br />match records efficiently. Should the data require additional time to organize before <br />we can begin our valuation, we reserve the right to charge for this time at the <br />hourly rates shown below. <br />If benefits are significantly different than described to us. <br />• Consulting or actuarial projections relating to possible plan redesign. <br />Biickmore 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.