Laserfiche WebLink
City of Santa Ana May 27, 2014 <br />On -Call Demolition Services RFP No.: 14 -026 <br />Contract Value: $173,142.63 <br />Contact; Louisa Tan, Admin Mgr, 213 - 473 -0657 <br />City of Los Angeles <br />555 Ramirez St, Space1500, LA, CA 90012 <br />Right of Way Demolition & Clearance Services — Orange County Transportation Authority <br />CTO #C -6 -2407; 360, 380, 450 & 480 S. Placentia Avenue Demolition and Site Clearance <br />Year: 2009.2010 <br />Project included multiple Contract Task Orders per our master agreement, No. C -5 -2407 at various <br />locations along Placentia Ave for OCTA, Grade Separation Projeot,Tasks included securing site with a <br />chain link fence, obtaining all required permits, preparing and furnishing water pollution control plan in <br />accordance with CALTRANS Manuals and implementation /maintaining plan, removal of contaminated <br />soil, asbestos, lead and other hazardous materials, coordinating and or terminating utilities, demolition <br />and removal of structures that included a 30,000 sq ft concrete tilt -up structure, car wash facility and <br />former gas station Sites were backfillad, compacted and graded to drain As a close out requirement, <br />J &G prepared and provided to OCTA all required manifests for all hazardous materials taken off site for <br />disposal. As with all projects, recycling is part of our operations and the above project achieved greater <br />than a 90% recycling effort James Cain was the project manager and Eric Cain was the field <br />superintendent. Tri Span provided asbestos abatement services and Gittens Environmental performed <br />the soil contamination removal /manifesting and reporting <br />Completed: August 2010 <br />Contract Value: $251,61930 <br />Contact: Bill Mock, Right of Way Agent - Tel: 714 - 560 -6282 <br />Orange County Transportation Authority (OCTA) <br />550 S. Main St, Orange, California 92863 <br />Reside ntlal /Commercial Properties Demolition -- City of Santa Ana <br />418, 718 & 908 N. Bristol St, Santa Ana <br />Year: 2010 <br />Scope of work included complete demolition of properties of a single family residence, restaurant and <br />former chiropractic office including above and below grade improvements All required permits wore <br />obtained for the project. Included was rat and vermin abatement prior to demolition and providing <br />written certification Asbestos and lead abatement was performed prior to demolition per surveys <br />provided by the City. BMP's were installed and sites were left backfilled and graded with imported CMB <br />J &G Industries Page 16 <br />251 -65 <br />