My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - SLURRY SEAL
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
08/05/2014
>
23B - PROJ - SLURRY SEAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2014 3:47:17 PM
Creation date
7/31/2014 3:26:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
8/5/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />CLERK OF COUNCIL USE ONLY: <br />AUGUST 5, 2014 <br />TITLE: APPROVED <br />CONTRACT AWARD FOR ARTERIAL ❑ As Recommended <br />STREETS RESURFACING USING ❑ As Amended <br />RUBBERIZED EMULSION AGGREGATE E] ordinance on Reading <br />0 <br />❑ Ordinance on tl Reading <br />SLURRY (PROJECT 146809) ❑ Implementing Resolution <br />❑ Set Public Hearing For <br />CONTINUED TO <br />z", - FILE NUMBER <br />CITY MANAG <br />RECOMMENDED ACTION <br />1. Award a contract to All American Asphalt, the lowest responsible bidder, in accordance with <br />the Base Bid, in the amount of $1,130,298, for the construction of the arterial streets <br />resurfacing using Rubberized Emulsion Aggregate Slurry. <br />2. Approve the Cost Analysis for a total estimated project delivery cost of $1,454,049. <br />DISCUSSION <br />The City has made a significant investment in rehabilitating arterial streets over the last ten years <br />and, therefore, maintaining and protecting that investment is a top priority. The City's Pavement <br />Management Program effectively strategizes short and long -term maintenance schedules to <br />maximize performance of the entire street pavement network, including identifying preventative <br />maintenance improvement projects. <br />The application of a surface slurry seal to asphalt streets every seven to ten years ensures a <br />continued high level of service. Historically, a conventional slurry seal has been used. In contrast, <br />rubberized slurry seals offer superior performance over conventional slurry by providing a more <br />flexible surface that resists cracking, while also benefiting the environment by repurposing recycled <br />tires. There are several rubberized slurry products available, including tire rubber modified slurry <br />seal (TRMSS) and rubberized emulsion aggregate slurry (REAS). Both of these products are <br />industry proven applications for street maintenance. Additionally, both provide similar wear and <br />aesthetic characteristics. Based on the City's Pavement Management Program, staff has identified <br />a project area in which the REAS product will be used to rehabilitate arterial streets (Exhibit 1). To <br />determine future preference, the performance of this product will be compared with another project <br />area using the TRMSS product. <br />23B -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.