My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55C - RESO - FIXED GUIDEWAY PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
08/05/2014
>
55C - RESO - FIXED GUIDEWAY PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2014 8:54:04 AM
Creation date
8/4/2014 8:51:28 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55C
Date
8/5/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Operations & Maintenance (O &M) Facility Location: The preferred location for the <br />maintenance facility for the streetcar is between the PE ROW and 51h Street, west of Raitt <br />Street (between Daisy Avenue and English Street. This is Site B as examined in the <br />EA /D E I R. <br />4th Street Parking: Diagonal parking is currently provided along 4th Street between Ross <br />Street and French Street. It is recommended that, with implementation of the streetcar, <br />the diagonal parking along the south side of 4th Street be replaced by parallel parking (4th <br />Street Parking Scenario A), resulting in the loss of approximately 26 to 30 parking spaces <br />along the roadway segment. The sidewalks along the south side of 4th Street will be <br />widened from 12 feet to 20 feet. <br />Section 5.5 provides a more detailed discussion of the physical and operating <br />characteristics of the recommended LPA. <br />LPA Decision Report <br />July 2014 <br />55C -22 <br />61 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.