My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55C - RESO - FIXED GUIDEWAY PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
08/05/2014
>
55C - RESO - FIXED GUIDEWAY PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2014 8:54:04 AM
Creation date
8/4/2014 8:51:28 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55C
Date
8/5/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• A Transportation Management Plan. <br />• Best management practices to ensure safety and security, access for emergency <br />vehicles, reduce surface runoff and water pollution, noise, erosion, and minimize <br />construction effects. <br />Stakeholder, agency, and community coordination will be required during advanced <br />design, including but not limited to the following: <br />• Coordination with the United States Army Corps of Engineers, Santa Ana Regional <br />Water Quality Control Board, Orange County Department of Public Works, and Orange <br />County Parks to minimize impacts at the Santa Ana River crossing. <br />• Coordination with the Santa Ana Unified School District and Santa Ana Police <br />Department regarding safety at schools adjacent to the alignment. <br />• Coordination with security personnel at the Ronald Reagan Federal Building and United <br />States Courthouse. <br />L P A Decision Report <br />July 2014 <br />55C -58 <br />3.81 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.