My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - EIR 1584 SANTA CLARA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
09/02/2014
>
75B - PH - EIR 1584 SANTA CLARA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2014 4:18:57 PM
Creation date
8/28/2014 3:54:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
9/2/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
604
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final EIR No. 2011 -01, VA No. 2012 -04 & VTTM No. 2012 -02 <br />February 10, 2014 <br />Page 14 <br />This EIR is intended to provide a forum to air and address comments pertaining to the analysis <br />contained in the draft EIR and to provide an opportunity for clarification, corrections, or minor revisions <br />to the EIR as needed. Comments were received during the public review period. Pursuant to Section <br />15088 of the State CEQA Guidelines, the City, as the lead agency for the project, has reviewed all <br />comments received on the document. <br />As a result of the environmental analysis, mitigation measures have been provided to address <br />potential environmental impacts. A list of these mitigation measures are found within the attached <br />Mitigation Monitoring and Reporting Program Summary. Mitigation measures have been outlined <br />to address potential impacts on geology, hazardous materials, water quality, noise, transportation <br />and circulation, cultural resources, air quality and biological resources (Exhibit 14). <br />Conclusion <br />Based on the analysis provided within this report, staff recommends that the Planning Commission <br />recommend that the City Council adopt a resolution certifying Final Environmental Impact Report <br />No. 2011 -01 and approve the mitigation monitoring program for the Sexlinger Farmhouse and <br />Orchard; adopt a resolution approving Variance No. 2012 -04(a) and (b) as conditioned; and adopt <br />a resolution approving Vesting Tentative Tract Map No. 2012 -02 (County Map No. 17231) as <br />conditioned. <br />V F� <br />Vince Fregoso,�AICP <br />Acting Planning Manager <br />VF:jm <br />vRTava EIMSeAnger Project.021014.pc <br />Attachments: <br />Exhibit 1 — General Vicinity Map <br />Exhibit 2 — Land Use Map <br />Exhibit 3 — Site Photo <br />Exhibit 4 — Site Plan <br />Exhibit 5 — Floor Plan <br />Exhibit 6 — Building Elevations <br />Exhibit 7 — Conceptual Landscape Plans <br />Exhibit 8 — HRC Intent to Demolish Final Report <br />Exhibit 9 — HRC Resolution <br />Exhibit 10 — Environmental Impact Report with Additional Analysis <br />Exhibit 11 — Vesting Tract Map <br />Exhibit 12 — Correspondence from The Old Orchard Conservancy <br />Exhibit 13 — Correspondence from Rutan & Tucker, LLP <br />Exhibit 14 — Mitigation Monitoring and Reporting Program <br />75B -16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.