My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2014-09-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
09/02/2014
>
FULL PACKET_2014-09-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2014 6:13:23 PM
Creation date
8/28/2014 5:32:20 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/2/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Larger economic development potential <br />PARKING & BICYCLE ACCESS RECOMMENDATION <br />• Parking on both sides of 4th Street <br />• Reconfigure to parallel parking on the south side <br />• Option to accommodate bicycle track <br />• Pedestrian amenities to encourage walking <br />PARKING & BICYCLE ACCESS OPTION <br />• Implementing streetcar on 4th Street opens up the opportunity to <br />incorporate bicycles on 4th Street that would not be possible without <br />streetcar— bicycles and diagonal parking are not compatible. <br />ADVANTAGES TO 47" STREET ALIGNMENT <br />• Active corridor supports high- capacity transit <br />• Increased visual exposure and access for 4th Street Businesses <br />• In the heart of Downtown <br />• Widen sidewalk on south side to foster pedestrian /street level activities <br />• Fewer utilities than 5th St. This reduces construction complexity, cost, <br />and duration <br />• Predictability — Streetcar delivers new customers every 10 minutes <br />during peak hours and 15 minutes during off peak <br />STREETCAR CONSTRUCTION (DOES NOT REQUIRE DEMOLITION <br />OR RECONSTRUCTION OF THE ENTIRE ROADWAY) <br />• Minimal impact for any business <br />• Construction is faster than other projects <br />• Perform construction in 2 -3 block segments <br />• 2 -3 months per segment <br />• Work schedule flexibility (day, night, weekend flexibility, etc.) <br />• Maintain pedestrian access <br />• Parking concessions limited to extent possible <br />ROLE OF SANTA ANA & MEMORANDUM OF UNDERSTANDING <br />(MOU) WITH ORANGE COUNTY TRANSPORTATION AUTHORITY <br />(OCTA) <br />• OCTA to become Lead Agency <br />• Santa Ana will have a 10% Operating Cost financial commitment <br />• MOU concludes with the Alternatives Analysis & EA/EIR <br />CITY COUNCIL MINUTES 11 AUGUST 5, 2014 <br />1 0A -11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.