Laserfiche WebLink
Bid Date: 04/23/2014 <br />THE AMERICAN INSTITUTE OF ARCHITECTS <br />AIA Document A31 d <br />KNOW ALL MEN BY THESE PRESENTS, that we <br />Lehman Construction, Inc. <br />(Here Insedfull name and address or legal tips of Con tactor) <br />as Principal, hereinafter called the Principal, and RLI Insurance Company <br />(Here need full name and address or legal title of Surety) <br />P.O. Box 3967 Peoria Illinois 61612-3967 a corporation duly organized under the laws of the State <br />Of Illinois as Surety, hereinafter called the Surety, are held and firmly bound unto <br />City of Santa Ana as Obligee, hereinafter called the <br />(Here lased full name and address or legal lllle of Owner) <br />Obligee, in the sum of Ten Percent amount of Bid <br />Dollars( i osis ), for the payment of which sum well and truly to be made, the said Principal and the <br />said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, <br />firmly by these presents. <br />WHEREAS, the Principal has submitted a bid for Project 13-2636 Santa Ana Zoo New Ocelot Exhibit <br />(Here Insert full name and address and description of project) <br />Located at: 1801 E Chestnut Ave, Santa Ana, CA 927001 <br />NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter Into a <br />Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be <br />specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such <br />Contract and for the prompt payment of labor and material furnished In the prosecution thereof, or in the event of <br />the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the <br />Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger <br />amount for which the Obligee may in good faith contact with another party to perform the Work covered by said <br />bid, then this obligation shall be null and void; otherwise to remain in full force and effect. <br />Signed and sealed this 14th day of 812ril , 2014 . <br />(Witness) <br />Lehman Construction, Inc. <br />RLI Insurance Company <br />(Surety) (Seal) <br />17 <br />Timothy C. Baker (Title) Attorney -In -Fact <br />AIA DOCUMENT A310• BID BOND- AIAO- FEBRUARY 1970 ED- THE AMERICAN 1 <br />INSTITUTE OF ARCHITECTS, 1735 N.Y. AVE., N.W., WASHINGTON, D.C. 20006 <br />t.lr7 Prinled on Ree.veled Paper 9193 <br />WW C0037603-50,0 <br />