My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NORTHSTAR DEMOLITION AND REMEDIATION, LP - 2014
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
NORTHSTAR DEMOLITION AND REMEDIATION, LP - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 12:07:07 PM
Creation date
9/8/2014 3:54:35 PM
Metadata
Fields
Template:
Contracts
Company Name
NORTHSTAR DEMOLITION AND REMEDIATION, LP
Contract #
A-2014-184
Agency
PUBLIC WORKS
Council Approval Date
8/5/2014
Expiration Date
8/4/2017
Insurance Exp Date
7/1/2018
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana On -Call Demolition Services Proposal <br />Understanding of Need Statement <br />w <br />On -Call Demolition Services <br />City of Santa Ana <br />Santa Ana, CA <br />This work plan is for the demolition of a single story 2,250 square foot concrete block building in the city of Santa <br />Ana and associated 4,000 square foot asphalt parking lot. Once the South Coast Air Quality Management District <br />notification has been made, NCM will mobilize with an asbestos abatement crew. This crew will consist of 3-6 <br />asbestos certified workers trained to remove any and all asbestos identified in City provided surveys. After the <br />removal and disposal of the hazardous waste is complete, NCM will mobilize the demolition team to complete the <br />work. <br />The building appears to be an auto shop of some sort so there may be hazardous oils, lifts and underground tanks <br />that will have to be cleaned and disposed of before the demolition process can begin. NCM will put in place erosion <br />control measures to prevent runoff of materials from the jobsite, including sand bags, fencing, straw waddles and <br />other similar items. <br />Once the demolition does begin, the work will be done using a mix of manual labor, front loader and an excavator to <br />accomplish this project. The project is expected to last 3 to 5 working days. <br />The first order of demolition will be the removal of the interior trash and interior walls. If possible the roof would be <br />salvaged for reuse depending on the quality of the wood. Once the interior demolition is complete the hard <br />demolition begins with the loader and excavator. During the process the concrete and metal materials will be <br />separated for salvage. The metal will be placed in bins for reuse and the concrete and asphalt will be hauled to <br />recycling facilities. <br />Once all of the debris has been removed from the site NCM will rough grade the site, compacting all voids to 90 <br />percent and importing fill if necessary, <br />NCM assumes testing for asbestos and all hazardous materials at all sites will be paid for and conducted by The <br />City of Santa Ana. <br />7 NCM Confidential and Proprietary Information <br />Not for Disclosure — Competition Sensitive <br />
The URL can be used to link to this page
Your browser does not support the video tag.