My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NORTHSTAR DEMOLITION AND REMEDIATION, LP - 2014
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
NORTHSTAR DEMOLITION AND REMEDIATION, LP - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 12:07:07 PM
Creation date
9/8/2014 3:54:35 PM
Metadata
Fields
Template:
Contracts
Company Name
NORTHSTAR DEMOLITION AND REMEDIATION, LP
Contract #
A-2014-184
Agency
PUBLIC WORKS
Council Approval Date
8/5/2014
Expiration Date
8/4/2017
Insurance Exp Date
7/1/2018
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPLETED PROJECT REFERENCES <br />(Abatement and Demolition) <br />Name, Address and Telephone Amount of Contract Start <br />of Owner of Work or Prime Contractor (to closest thousand dollars) Date <br />Complete Scope of Work <br />Date <br />University House Fullerton, LLC $1,360,605 3/09 <br />7/09 Abatement, universal waste collection and <br />Inland American Communities Group, Inc. <br />demolition of 6 structures totaling 220,000 <br />3890 W. Northwest Highway, Suite 700 <br />square feet on a 6 acre site. Buildings <br />Dallas, TX 78220 <br />included 2 two story 30 unit student housing <br />Barry Klinger, (469) 232-1393 <br />structures, 2 two story multi function <br />bcklinger@inlandac.com <br />classroom and office buildings, one seven <br />City of Los Angeles, DPW -BOE <br />story concrete office building and one single <br />1149 S. Broadway, Suite 120 <br />story steel storage building. Major quantities <br />Los Angeles, CA 90015 <br />of asbestos included 30,000 sq ft of spray <br />Russ Strazzella, (213) 847-2406 <br />applied acoustic ceiling material, 225,000 sq <br />russ.strazzella@lacity.org <br />ft of plaster/drywall 15,000 sq ft of flooring <br />materials and 4,000 linear feet of asbestos <br />containing/insulated piping. Concrete was <br />crushed on site. Over 90 percent of the <br />demolition materials were recycled. Former <br />Hope University and commercial buildings, <br />Fullerton, CA <br />City of Long Beach, Harbor Department <br />$1,200,732 1/09 3/09 Abatement and demolition of 200,000 sf steel <br />925 Harbor Plaza <br />framed warehouse office building <br />Long Beach, CA 90802 <br />approximately 40' high. Work includes <br />foundations and replacement of dirt and <br />(56 <br />Steve Pettee (562) 590-4172 <br />paving to create open parking space at an <br />SetteePettee <br />active container terminal. Building T-126, Port <br />of Long Beach, CA <br />City of Los Angeles, DPW -BOE <br />$1,300,500 3/09 4/09 Removal and disposal of ash and debris from <br />1149 S. Broadway, Suite 120 <br />474 wildfire damaged mobile home units, <br />Los Angeles, CA 90015 <br />asbestos abatement of 12 units, removal of <br />Russ Strazzella, (213) 847-2406 <br />41 damaged vehicles and associated site <br />russ.strazzella@lacity.org <br />clearing. Oakridge Moble Home Park Wilfire <br />Debris Clean -Up, Sylmar, CA <br />NCM Demolition and Remediation, LP GWdministration\Sharon\Demo Ref Master with #s.xls 512 712 01 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.