Laserfiche WebLink
D. If the applicable designated construction project <br />has been abandoned, delayed, or abandoned <br />and then restarted, or if the authorized contract- <br />ing parties deviate from plans, blueprints, de- <br />signs, specifications or timetables, the project <br />will stilt be deemed to be the same construction <br />project. <br />E. The provisions of Section III - Limits Of Insur- <br />ance not otherwise modified by this endorse- <br />ment shall continue to apply as stipulated. <br />Page 2 of 2 Insurance Services Office, Inc., 2008 CG 25 03 05 09 ❑ <br />REVIEWED BY: ELU(E HEREMA (p(.;d <br />