My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARRO AUTOGAS-2014
Clerk
>
Contracts / Agreements
>
A
>
ARRO AUTOGAS-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2015 4:51:15 PM
Creation date
9/8/2014 4:51:21 PM
Metadata
Fields
Template:
Contracts
Company Name
ARRO AUTOGAS
Contract #
A-2014-075
Agency
PUBLIC WORKS
Council Approval Date
3/18/2014
Insurance Exp Date
9/29/2016
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
with providing propane fuel. Contractor will provide the data required by City to audit the <br />accuracy of City revenue share receipts. <br />Contractor shall monitor fuel supply in the propane tank and the reorder /refill process without <br />downtime to City facility. <br />V, Fuel: <br />Propane must meet the California Air Resources Board (CARE) propane motor fuel specified <br />levels. Fuel provider must provide alternative refueling locations with public access and 24 -hour <br />card reader electronic point of sale (EPOS) system throughout Southern California. <br />VI. Erosion Control Plan ( SWPPP <br />For construction related projects having less than one (1) acre of disturbed soil, contractor shall <br />prepare an erosion and sediment control plan immediately after award of the contract, for <br />approval by the Agency. <br />The erosion control plan shall remain in effect until approval to remove is granted by the <br />Agency. <br />VII. Record Drawings: <br />Contractor shall provide record drawings of facility as installed, and all related permits, <br />Licenses And Permits <br />Contractor shall apply for and obtain all necessary permits as required by the City and all other <br />regulatory agencies including Federal, State, and County jurisdictions, including the Orange County <br />Fire Authority. City permits will be "no fee" permits. All fees required by other jurisdictions, within the <br />Contractor's Scope of Work as described in RFP 13 -012 shall be the responsibility of the contractor, <br />OWNERSHIP <br />Fueling Station: Contractor to pay for, provide and install equipment (bulk storage tank, dispensing unit, <br />motor /pump, key card system), which will be property of contractor /vendor for term of contract. When <br />contract period ends, vendor shall remove said equipment from site. <br />Commodity Purchase: City of Santa Ana will purchase propane fuel for City of Santa Ana Fleet Service <br />vehicles at agreed upon cost. Contractor shall contract independently with private companies for their <br />fuel purchase Contractor shall obtain business and seller's permits as outlined in this RFP. <br />—City of Santa Ana RFP 13 -012 —_ -._ .. ---- - --- -_ <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.