Laserfiche WebLink
A <br />City of Santa Ana, PWA I Agreement Exhibit <br />RFP — ON -CALL ENGINEERING DESIGN SERVICES FOR WATER AND SEWER MAIN <br />IMPROVEMENTS <br />SAMPLE PROJECT FEE <br />Consultant shall use this Sample Project Fee for the Cost and Price Analysis Comparison and <br />include it along with the comprehensive fee schedule in the sealed fee envelope. This <br />comparison is based upon design engineering services required for approximately one plan of <br />water main improvements and sewer main improvements, including specifications and cost <br />estimate for the following sample project: <br />3,200 L.F. of 8" PVC (AWWA C -900) water main improvement project for the following limits- <br />• Rene Drive — Hemlock Way to Segerstrom Avenue <br />• Rita Way — San Lorenzo to Segerstrom Avenue <br />• Spruce — San Lorenzo to Segerstrom Avenue <br />• Pacific Ave — San Lorenzo to Segerstrom Avenue <br />• San Lorenzo — Rene Drive to Pacific Avenue <br />4,100 L.F. of 8" PVC (SDR -26) sewer main improvement project for the following limits: <br />• Myrtle Street — Bristol Street to Center Street <br />Provide a detailed scope of work for the tasks required to complete this sample project. City <br />Atlas sheets have been provided to assist with sample project area scope. Assume that a <br />geotechnical investigation is required due to a history of high groundwater in the proposed <br />areas. An environmental determination will also be necessary for this sample project. <br />This Sample Project will be used for FEE and man -hours comparison purposes only. <br />The sample plan to be submitted shall be assumed at 20 scale and shall be the Consultant's <br />closest representation for work related to the Sample Project. The submitted sample plan shall <br />be of a Consultant's previously submitted and approved work. <br />TYPICAL SCOPE OF WORK <br />TASK NOA <br />1. Initial Meeting <br />a. Attend project kick -off meeting with City staff to review the project scope, <br />schedule, budget and work plan. Adjust task schedule and work plan as required. <br />b. Review design criteria and parameters. <br />2. Data Gathering <br />a. Obtain available survey records from the City. <br />b. Review existing street, water, sewer, storm drain and utility plans and maps in <br />the possession of the City. Consultant is responsible for the copying of any <br />documents. <br />c. Field review and take photographs that include any impacted adjacent <br />improvements. <br />3. Utility Research <br />A detailed utility search along the proposed alignment will be conducted. It will consist of <br />17 <br />