Laserfiche WebLink
Relevant Experience <br />We believe that our best relevant experience is the <br />more than 20 projects that we have completed for <br />the City of Santa Ana (City) since 1999- We are <br />confident that these past projects with the City will <br />attest to our technical excellence, responsive staff <br />and our complete understanding of the City's water, <br />and sewer facilities. We are committed to providing <br />the City with the high quality service that we <br />provided on our previous projects. Our previous <br />work for the City included a wide range of <br />engineering services including: pipelines, pump <br />stations, lift stations, flow control facilities, upgrade <br />of facilities, studies, and structural support services. <br />As part of these projects with the City, we have also <br />developed relationships with several regulatory <br />agencies including the Deparanent of Public <br />Health, Orange County Flood Control and <br />Metropolitan Water District. In addition, we have <br />developed an excellent working relationship with <br />the City's Public Works' staff, Parks and Building <br />Departments and Construction. Management. <br />Because of Tetra Tech's large pool of talented <br />engineers and scientists we will be able to submit <br />proposals on all request for proposals received as <br />part of this On -Call Contract'. We believe that the <br />City of Santa Ana is our best reference for our <br />performance and execution on our previous <br />contracts. Summarised below are the projects that <br />we have performed for the City since 1999. Please <br />see our proposal cover sheet identifying the <br />locations of these projects. <br />Water Main Projects <br />• Bristol Street Widening Water Main Replacement, <br />Phase I <br />• Centennial Park Water Main Replacement <br />• Mid City Neighborhood Water Mains <br />• Pico - Lowell Water Main Improvements <br />• Central City Water Main Replacement <br />Sewer Main Projects <br />• 1,Yesiminster Avemre Sewer Main lntprovements <br />• McFadden Avenue Sewer Replacement <br />Pump Station/Well Projects <br />• South Station Booster Pump Modifications <br />• Well No.34Modfcations <br />• 1,VellATo.39 <br />lift Station Projects <br />• San Lorenzo Lift Station <br />• Maxine Lift Station Emergency Bypass <br />Reservoir Projects <br />• John Garthe Reservoir Improvements Phase 2 <br />• Elevated Tank Safety Improvements and Painting <br />Flow Control /PRS Facilities <br />• SA -3 Flow Control Facility <br />• SA -4 Flow Control F-acdify <br />• SA -5 flow Control Facility <br />Recycled Water Projects <br />• Recycled Water Conversion Projects <br />Miscellaneous Building/Facilities Upgrades <br />• Concord Street Retaining Wall At Cambridge <br />Reservoir Site <br />Studies/Reports /Miscellaneous Support <br />• Well No. 32 Nitrate Migration Study <br />• OCSE Sewer Transfer Consulting Services <br />• AlicrostationSupport <br />• Parton Sewer Notice of Exemption <br />• Feasibility Study for Elimination ofMarins Lift <br />Station <br />• Sewer Master Plan Update Support <br />• Water System Computer Modeling Support <br />,Santa Ana Elevated Tank <br />w: �MmtmiNy�r: nnoea�e�waivs�rzara�wzoaz _anonctmr'•s�s -2- TETRA TECH <br />