Laserfiche WebLink
Mr. Mike Tsoi, P.E. will be the Task Engineer for <br />the Pump Station and Lift Station Facilities. Mr. <br />Tsoi has been the Project Engineer for several <br />pump stations and well facilities for Irvine Ranch <br />Water District, the City of Lakewood and the City <br />of Orange, Over his career, Mr. Tsoi has designed <br />over 20 pump station, lift station and well facilities. <br />Ms. Crisna Estrada, EE, will be the Task <br />Engineer for the permitting of the various projects. <br />Ms. Estrada's previous work on the Foothill Toll <br />Road South Utility Relocations will be invaluable <br />as she was able to coordinate the obtaining of all <br />the necessary permits with multi - permitting <br />agencies even though the project and relocation <br />work had very sensitive permitting issues. <br />Mr. Ken Berard, P.E. will be the Task Manager for <br />the Hydraulic Analysis. Mr. Berard has been the <br />Project Manager for over 15 Master Plans. He has <br />performed numerous studies ranging from complete <br />water /recycled water /sewer master plans to <br />efficiency studies for various Southern California <br />water agencies. <br />Mr. Yietor Ramirez, P.E., S.E. will be the Task <br />Manager supporting the structural design needs for <br />this contract. Mr. Ramirez has provided structural <br />support services for the majority of the past City <br />projects including John Garthe Reservoir <br />Improvements Phase 2. His structural engineering <br />design experience includes the design of water <br />storage and water conveyance related structures as <br />well as seismic rehabilitation of these facilities. <br />Mr. Mazen Kassar, P.E. will be the Task Manager <br />for electrical and controls. Mr. Kassar has <br />supported all projects involving electrical and <br />controls designed by our water /wastewater group in <br />Irvine for the last several years. <br />Within the Project Team Chart, we have included <br />the depth of our Irvine Office's Water and <br />Wastewater group. We have a large group of design <br />engineers that will be able to support the Technical <br />Leads. This large talent pool to draw from will <br />allow Tetra Tech to rapidly deploy and meet <br />aggressive project schedules. <br />We have included a chart summarizing our Project <br />Team's education and years of experience. In <br />addition, we have included an exhibit showing how <br />the project team has worked together on the <br />majority of the relevant projects. <br />We have included detailed resumes for all of these <br />personnel in the Appendix. <br />Subconsultants <br />In order to provide all of the services we feel will <br />be needed for this project, Tetra Tech has added the <br />following subconsultants to our project team: <br />Design Survey, Mapping and Legal Description <br />Preparation: <br />Coast Surveying, Inc. <br />Gemechnical Services: <br />Leighton Consulting, Inc. <br />Painting and Coaling /Re- Coating: <br />Harper & Associates Engineering, Inc. <br />Potholing: <br />C -Below or Kantex Industries or Saf -r -Dig <br />Traffic Control. <br />PMK Associates <br />Tetra Tech has provided several consultants for the <br />potholing services in order to be sure that one of <br />them will be able to meet the City's aggressive <br />schedule, if necessary. <br />Tetra Tech has worked with all of the above <br />consultants on various other projects for several <br />years and as a team we have been a part of the <br />successfid completion of these projects. <br />Interview <br />The following team members are available for the <br />interview: Tom Epperson, Mark Bush, Laurence <br />Esguerra, and Mazen Kassar. <br />mammkoo �s�p« poso is\Wrns�rv2014�wm4 }A- 0nCullEn5r& -4- TETRA TECH <br />