Laserfiche WebLink
RBF was hired to prepare the POLB Sewer Master Plan and CIP In 2011. The project was completed in 2013 to great <br />acclaim by POLE staff. POLB recommended RBF submit the project for several association awards, In part due to <br />the excellent work provided on the Sewer Master Plan, RBF was awarded an contract with POLE, as one of <br />three firms. RBF has been awarded the first two water /sewer related task orders. The first is a water system <br />interconnect project that provides looping to the water system at three locations on Pier D. The second project is a <br />sanitary sewer abandonment on Pier C to properly design the abandonment of <br />inactive sewer lines previously owned by LEWD, City of Long Beach, LACSD, and <br />POLB. RBF has been awarded multiple task orders beyond water /sewer disciplines <br />including designs and studies fortraffic control and transportation related disciplines, <br />Emergency Relocation of 20' -inch Waterline, Long Beach , . CA. RBF was selected by <br />the Port of Long Beach to provide professional engineering services to prepare design <br />plans for the emergency relocation of a 20 -inch domestic water pipeline. RBF <br />reallocated resources so that key staff members could dedicate 100 °1° of their time to <br />prepare design . plans to build approximately 2,000 LF of new 20 -Inch waterline in <br />Scenic Harbor Drive. The pipeline was drafted in accordance with the Port's drafting <br />standards and designed to meet the Long Beach Water Department's design <br />standards. RBF's responsiveness, dedication and coordination efforts led to the <br />completion of a design package within four weeks, <br />Client Reference: <br />Mr. Dan Ferons, <br />Genet al Manager <br />949/459 -6590. <br />danf[dsrrrwd.com <br />Santa Margarita Water District <br />26111 Antonio Parkway <br />Rancho Santa Margarita, CA <br />Hey Staff serving this client: <br />John Nagle Kevin G,ustorf <br />Sal Sheikh Rhonda:-rilerina <br />Bill Cox Rich Beck <br />Emergency relocation of a 20" <br />water pipeline for the PDLB <br />Santa Margarita Water district- Middle Chiquita Canyon Water <br />Facilities <br />wkiAr ouR cuENTs SAY: <br />Re. City of Anaheim, Citywide Sanitary Sewer System Repair and Rehabilitation ProgramfProjects (Ph. 111 -Group 1, <br />Vilest Anaheim' "on behalf of the City ofAnahelm, I would like to personally thank the OF team for their excellent <br />support on the Citywide Sanitary Sewer System Repair and Rehabilitation Program (Phase 111-Group 1, West <br />Anoi eim project ). Kevin Gustorf,. Project Manager, and Tart Yokoyrrrna, Project Engineer, were instrumental in <br />delivering a high quality set of construction documents within the project schedule_ Their dedication and profes- <br />sionallsm helped our project move forward smoothly andeffidently. The solutions provided byR @F will significantly <br />improve the rellpbility of the City's gravity sewer collection system which will mitigate the possibility o %future sewer <br />splits. Thank you again for yourteam's continued service to the City ofAnraheirm' <br />Khan Chu, . P.E., Principal Civil Engineer, City ofAnaheim <br />