• Aboveground utilities including valves, pull-boxes, meters, . and vaults. <br />• Manhole Rims, and selected inverts. <br />• All major surface features that define the shape of the terrain, such as tops and toes of <br />slopes, grade breaks and natural ground <br />Fences and walls <br />Unless otherwise directed by the Client, the basis of horizontal control will be California <br />Coordinate System of 1983 (CCS 83, Zone V, Epoch 2011,00). Coordinates will be expressed as <br />grid values. in :terms: of the U.S. survey foot. Vertical control will be in terms of the North <br />American Vertical Datum of 1988 (NAVD88), <br />c, Miscellaneous Surveys, Pothole Locations, Manhole Dips: Consultant shall perform 16 hours of <br />misc. field surveys as follows: <br />Stakeout and collect as-built information for potholing surveys. <br />• Detail pipeline dimensions, locations, flow directions, and inverts. <br />Miscellaneous surveys to collect greater detail to supplement normal cross- section <br />surveys. <br />Prepare Base Maps <br />a. Base maps will be prepared of the existing surface features obtained from the Design Survey <br />task.A utility base map will be prepared for all existing utilities within the project limits based on <br />the utility research and pothole task, The base maps will be prepared at 1:1 per City CAD <br />standards. <br />Deliverables: All CAD files <br />8. Geotechnlcal investigation <br />a. A geotechnical investigation will be conducted for the construction of the sewer lines and water <br />lines. The field exploration will consist of three (3) borings each to a depth of 15 feet below <br />ground surface (or refusal) whichever Is reached first. The locations will be as close to the <br />proposed pipeline Improvements as allowable, while avoiding existing utilities, The borings will <br />be patched with Perms Patch if the existing surface is asphalt concrete, or quick set concrete if <br />the existing surface is concrete. A professional traffic control crew will be provided during the <br />field Investigation to Implement traffic control per WATCH. it is assumed the preparation of <br />traffic control plans are not required, <br />b. The purpose of the investigation will be to determine construction requirements for the pipeline <br />Installations, The investigation will determine bedding and backfill requirements, groundwater <br />table . depth, . geologic and seismic conditions, maximum stable side slopes for trench excavations, <br />construction method requirements for new pipeline installations.. The findings and <br />recommendations will be included In a report. <br />c. Deliverables: <br />I. Draft Report (pdf and hard copies -4) <br />fl. Final Report (pdf and hard copies -4) <br />9. Alignment Selection <br />Evaluate alignment alternatives considering construction cost, utilities, community impacts, <br />permitting, access, connections to existing pipelines, and traffic control. <br />Identify the proposed method of connecting to existing pipelines (ie. Hot tap, cu. in tee, other). <br />Prepare "strip maps" showing proposed alignment, existing utilities, and existing street section. <br />The strip maps will allow the City and RBF team to easily see the proposed alignments and to <br />facilitate discussions if any alignment changes are needed. REP will conduct a workshop at the <br />