My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RBF CONSULTING 5 - 2014
Clerk
>
Contracts / Agreements
>
R
>
RBF CONSULTING 5 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2015 10:10:51 AM
Creation date
9/8/2014 4:51:23 PM
Metadata
Fields
Template:
Contracts
Company Name
RBF CONSULTING
Contract #
A-2014-130
Agency
PUBLIC WORKS
Council Approval Date
6/3/2014
Expiration Date
6/30/2015
Insurance Exp Date
8/30/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task No. 2 — Finalize Design <br />I. 90 %PS &E <br />a. The 90% PS &E submittal shall . include plans, specifications, and cost estimate at 90% completion <br />level (horizontal alignment and design, profile, details). Plans will be prepared in Microstation v8i <br />per City standards. The anticipated plan sheets for the 90 °% submittal Includes a total of 17 <br />sheets as listed below. No additional sheets are anticipated to be added after the 90 °%submittal, <br />G1 =4 Title Sheet and General Sheets (4 sheets) <br />PP1 -5 Water Plan and Profile Sheets (5 sheets) <br />PP6 -10 Sewer Plan and Profile Sheets (5 sheets) <br />DTI-3 Details (3 sheets) <br />b. Specifications and cost estimate will be prepared and updated based on comments received from the <br />City. All documents will be prepared per City standards. <br />c. Deliverables:. <br />1. 90% PS &E (pdf and hard copies — 3) <br />21 100 %PS &E <br />a. The 140% PS &E submittal will Include all components of the 90o %PS &E with the appropriate updates <br />per City comments. <br />b. Deliverables: <br />i. 100% PS&E (pdf and hard. copies 3) <br />3. Final Bid Documents <br />a. The Final Bid Document package will include all required "bid- ready" construction documents <br />including plane, specifications, and cost estimate. All documents will be provided in the format <br />requested by the City and stamped and signed by the appropriate individuals, <br />Is. Deliverables: <br />1. Final .Bid Documents (pdf, CAD files, MS 'Word files for specifications, and mylars signed and <br />stamped) <br />Task No. 3 — Bid Phase Services <br />1. Respond to request for clarification from prospective bidders (assume 4), <br />2. Issue addenda to the bid package as necessary. <br />3. Deliverables: <br />a. RFC Responses <br />It. Bid Addenda <br />Task No. 4 — Construction Management Support <br />1, Attend pre - construction meeting, and one meeting during construction. <br />2, Provide RFI responses (assume 5). <br />3. Review shop drawing submittals and provide responses (assume 20) <br />4. Prepare CADD As -Built drawings based on contractor mark ups and provide required electronic (CAD and GIS) <br />files to City In the required format. <br />S. Deliverables: <br />a. RFI Responses <br />b. Shop Drawing responses <br />c. CADD As-Built drawings based on contractor markups. <br />t° <br />
The URL can be used to link to this page
Your browser does not support the video tag.