Laserfiche WebLink
3.0 Schedule of Work to be Completed <br />3.1 Adams Park: 5 Days per wk, Feb 151 to July 15tn <br />3 Day per wk, July 16" to Jan 315t <br />3.2 Centennial Park: 5 Days per wk Feb 1"to April 31 st <br />3 Day per wk May 1 st to Jan 31st <br />3.3 El Salvador Park: 5 Days per wk, Feb 1st to July 15" <br />3 Day per wk, July 1611 to Jan 3191 <br />3.4 Heritage Park: 1 1 Day per wk Year round <br />3.5 Jerome Park: Field #1 <br />5 Days per wk, Feb 19t to July 15'" <br />3 Day per wk, July 16`1 to Jan 31st <br />Field #2 P #3 <br />1 Days per wk Year round <br />3.6.1 Riverview Park: 5 Days per wk, Feb 19'to July 15" <br />3 Day per wk, July 16t1 to Jan 315' <br />3.7 Rosita Park: 5 Days per wk, March 1't to July 31" <br />3 Day per wk, July 30" to Feb 28" <br />3.8 Thornton Park: 5 Days per wk Year round <br />3.9 Windsor Park: 3 Days per wk Feb 1" to July 15th <br />1 Day per wk July 16t" to January 319t <br />4.0 Field Composition Mix (Brickdust} To Be Used When Maintaining In- fields. <br />4.1 Field In General <br />4.1.1 When adding field composition mix (brickdust) to any City of Santa Ana infield, the <br />specific type of material to be used is: <br />Stabilizer Solutions Stabilizer Gold Infield Mix (with stabilizer). <br />4.2 Pitcher's Mound /Home Plate /Basepath Areas <br />421 When adding a mix with a higher clay composition material to any pitcher's mound /home <br />plate /base -path area, the specific type of material to be used is: Hill Topper Home Plate <br />and Mound Mix. <br />4.3 Warning Track <br />4.3.1 When adding field composition mix to ball diamond warning tracks the specified type of <br />material to be used is: Stabilizer Solutions Stabilizer Warning Track Mix. <br />Districts 1, 4 and 5 Park Landscape RFP <br />19t -36 <br />