Laserfiche WebLink
5.4 Wet Conditions Equipment' (Add to equipment above) <br />During periods of inclement weather or when the areas are wet the contractor shall have "on- <br />hand" during all brickdust maintenance operations the following items: <br />5.4.1 Squeegee: Used to pushlsqueeze water off wet areas or into dry areas or drains. Shall <br />be 24° to 36" wide with neoprene blade and magnesium /aluminum head. <br />5.4.2 "Super Sopper": Used to collect standing water in brickdust areas. Shall be drum type <br />with exterior sponge and arm holding drum. <br />5.4.3 Diamond or Beckson Pump: Used to remove standing water in brickdust areas. Shall <br />be plastic with flexible piston and value. <br />5.4.4 Infield Sopper with Wringer and Bucket: Used to collect standing water in brickdust <br />areas. Sopper shall be geotextile- covered sponge typical for absorbing chemical spills. <br />6.0 Meetings <br />6.1 Contractor shall provide City of Santa Ana staff with a contact person and a phone number to <br />reach the contact person from the hours of 6:30am — 5:00pm, Monday — Saturday. <br />6.21 Contractor shall appoint and identify to City of Santa Ana staff a "site supervisor ". This site <br />supervisor shall meet with staff as requested at time and place agreed upon by both parties for <br />as long as the contract is in effect to discuss any problems /concerns that may arise and any <br />goals for the week. <br />6.3 In November of each year for as long as the contract is in effect, Contractor shall personally <br />meet with staff, along with the desfgnated site supervisor, to discuss and outline schedules for <br />"Annual Renovations" (listed in Section 10.0), <br />7.0 Daily Infield & Warning Track Maintenance <br />7.1 General <br />7.1.1 Contractor shall remove all litter, broken glass and hazardous debris from infield and <br />dugout areas. <br />7.1.2 Contractor shall keep brickdust and dugout areas in a clean and weed free condition. <br />Dugouts shall be cleaned daily and be free of brickdust, stains, weeds and other debris. <br />Dugouts shall be hosed down weekly so they are completely free of any brickdust or <br />other stains /gum, sunflower seeds, etc. <br />7.1.3 Contractor shall hose and/or sweep and hose out all dugouts so they are 100% free of <br />brickdust, brickdust stains or any other debris. <br />7.2 Maintenance Procedure <br />7.2.1 Retain smooth and level playing surface, using the following daily procedure. The <br />contractor shall remove all bases before beginning any work on In -field and re- install <br />after all work on in -field is completed. <br />7.2.2 After removing all bases, the contractor shall scrape /wire brush all base post anchors <br />and base inserts. This will help facilitate the base removal and installation. <br />Districts 1, 4 and 5 Park Landscape RFP <br />P <br />19 -48 <br />