Laserfiche WebLink
7.5.5 When dragging the skinned infield, the contractor shall stay away from all turf edges a <br />minimum of 18 ". This will help in avoiding lips at brickdust(turf edges. This 18' gap shall <br />also apply to all backstops and chain link fence areas. <br />7.5.6 Contractor shall hand rake all base paths on combination turf/brickdust infields. <br />7.5.7 When the dragging process is complete, the contractor shall stop the drag in a different <br />location daily. This will stop the accumulation of brickdust in focused areas. At this time <br />roll -up the drag, place it on the vehicle and remove all debris accumulated in the drag at <br />this spot and rake out material emptied from drag. <br />7.5.8 After dragging, hand rake the 18" edges using the "grade or grooming rake ". The rake <br />shall be held at an angle as to not push brickdust onto /into turf areas. <br />7.5.9 After raking the 18" edges, the contractor shall clean all excess brickdust on the turf <br />edges utilizing a high pressure water nozzle or heavy duty broom. NO brickdust shall be <br />permitted on the turf edges at any time. If in the determination of City staff, an unsafe lip <br />situation exists (an unsafe lip Is 1 /z" or greater) in any turf/brickdust border area infield to <br />brickdust, base -paths or brickdust to outfield), contractor will be required to remove or <br />level the soil build -up with a sod cutter and re- establish the in -field boundaries with a <br />string line or suitable method and re -sod up to the border to remedy the situation at <br />contractors expense. Pre - existing conditions shall be corrected during contract start -up. <br />7.6 Final Watering <br />7.6.1 This is the most time consuming and a very important element of the procedure. <br />7.6.2 The contractor shall final water the skinned brickdust to a depth of 1/4" minimum. <br />8.0 Rainy WeatherNVet Field Procedure <br />8.1 On the next scheduled working day after a rainfall, the following procedure, in the order listed, <br />shall be adhered to: <br />8.1.1 Remove all standing water from low spots either by skimming off excess water and <br />spreading it out to dry areas or using a pumplsopper system. <br />8,1.2 Rake out (scarify) wet areas. <br />8.1.3 Apply Stabilizer Solutions Stabilizer Gold Infield Mix (with stabilizer) from stock to all Wet <br />Areas and Rake Out. Cap with calcified clay Turface. <br />9.0 Work to be Completed "BI- MONTHLY" <br />9.1 To maintain levelness of all fields, contractor shall, once every two months, scarify drag built up <br />amounts of materials at high spots and cut and level drag the scarified material to low spots. <br />The Contractor shall fill any remaining low spots with new Stabilizer Solutions Stabilizer Gold <br />Infield Mix (with stabilizer) brickdust from stock and make level. Cap with calcified clay Turface. <br />Note: Staff shall identify areas to scarify /cut and level drag to the contractor at weekly <br />meetings with contractors appointed site supervisor (as per section 6.2 of contract). <br />9.2 Heavy water scarified and cut and leveled areas to a Y2° min. depth and allow settling in before <br />play on field. <br />Districts 1, 4 and 5 Park Landscape RFP <br />19PEe00 <br />