Laserfiche WebLink
Construction Documents <br />Construction Documents phase (CDs) shall include preparation of plans and specifications for Contract <br />Documents, based upon the approved drawings from the Design Development phase, and a finalized "Opinion of <br />Probable Cost". <br />Plans: <br />Plan package shall include, but not be limited to the following: <br />Title Sheet <br />Civil Engineering <br />• Site Erosion Plan <br />• Horizontal and Vertical Control Plan <br />• Grading And On -Site Drainage Plan <br />• Site Utility Plan <br />Landscape Architectural <br />• Site Layout/Construction Plans And Details <br />• Site Sections, as applicable <br />• Planting Plans /Details /Notes <br />• Irrigation Plans /Details /Calculations /Notes <br />i Architectural <br />• Building Foundation Plan <br />• Building Floor Plan <br />• Building Framing Plan <br />• Roof Framing Plan <br />• Reflected Ceiling Plan <br />• Exterior Elevations <br />• Interior Elevations <br />• Building Sections <br />• Mechanical and Plumbing Plans/T -24 <br />• Electrical Plans <br />• Architectural and Structural Details <br />• Structural Calculations <br />• DoorMindow /Finish Schedules <br />Electrical <br />• Electrical Site Plan to include walkway lighting, shade structure lighting, amphitheater lighting, <br />Irrigation. <br />• Location of panels, switchgear, meters <br />• Schedules <br />• Details <br />• Photo Metrics <br />• Notes, specifications <br />Construction drawings shall be submitted at 90% completion for City staff review, and revised per City comments. <br />The 100% complete construction drawing package will then be submitted for final City review and approval. <br />Permits. <br />Construction drawings shall be in accordance with the 2013 California Building Code and will require <br />review /approval by the City Planning and Building Agency. <br />As a condition of plan check approval, plans, specifications and structural calculations must be signed by a <br />California licensed architect / landscape architect / civil engineer as appropriate. <br />City of Santa Ana RFP 14.036 <br />Page 10 <br />25D -16 <br />