My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WATER DISTRICT, ORANGE COUNTY (Green Acres Project Water) - 1988
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY OF
>
WATER DISTRICT, ORANGE COUNTY (Green Acres Project Water) - 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:58:48 AM
Creation date
9/19/2014 12:48:27 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wwj�1�-E <br />(hereinafter, the "Project Facilities' "). A plat depicting <br />that portion of the Project Facilities which OCWD shall <br />construct, operate and maintain within the boundaries of <br />RETAILER is attached hereto as Exhibit "A". OCWD shall cause <br />the Project Facilities to be completed and operational on or <br />before June 1, 1991, and RETAILER shall incur no cost or <br />liability in connection with the design or construction of <br />the Project Facilities. <br />1.2 The Project Facilities to be constructed shall <br />include a distribution pipeline system from the site of the <br />Green Acres Project Water Treatment Facility, to be located <br />at 1,0500 Ellis Avenue, Fountain Valley, California, to the <br />point of connection to each of the proposed Project Water <br />customers within the boundaries of RETAILER (hereinafter, <br />"Project Customers") , for the purpose of distributing Project <br />Water to RETAILER at the points of connection of the Project <br />Customers for purchase by RETAILER and resale to the Project <br />Customers. The names, addresses and anticipated annual <br />Project Water demands of each Project Customer are set forth <br />in Exhibit "B" hereto and incorporated herein by this <br />reference. <br />1.3 OCWD shall obtain all permits required to construct <br />and operate the Project Facilities, including the <br />distribution pipeline system and ancillary facilities to be <br />located within the public rights of way as shown on Exhibit <br />"All hereto, as well as those facilities which are necessary <br />to produce, deliver and distribute Project Water for the <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.