My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WATER DISTRICT, ORANGE COUNTY (Green Acres Project Water) - 1988
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY OF
>
WATER DISTRICT, ORANGE COUNTY (Green Acres Project Water) - 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:58:48 AM
Creation date
9/19/2014 12:48:27 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. The Operation and Maintenance Component shall be computed using only the following <br />incurred costs by 0CWD during the applicable Fiscal Year. <br />a. Professional consulting services for Project operation, maintenance and audit <br />excluding daily Project operation. <br />b. OCWD labor costs and/or contract labor costs equal to.- <br />$175,000 x (A / $22.89) <br />where A is maximum hourly rate for O&M Technician (i.e., entry level plant <br />operator) for the applicable Fiscal Year and $22.89 is the maximum hourly rate for <br />O&M Technician for Fiscal 'Year 1998-99, <br />Between July I and December 3 0 in the year 2002, and every third year thereafter, <br />any Party may request the Coordinating Committee to revise the allowable labor <br />cost. Labor cost in the first year of production of Allowable Yield shall be <br />prorated based on the number of days of production of Allowable Yield, <br />C. Chemicals and supplies for Project operation and maintenance, <br />d. Net electrical energy (recovered energy shall be deducted from energy purchased) <br />for Project operations. Metropolitan shall not pay for electrical energy cost if <br />OCWD fails to install electrical metering devices. <br />e. Contractor services and Supplies for Project facilities, operation, maintenance and <br />repair to maintain reliable system operation and achieve regulatory compliance. <br />f Monitoring required by permits, including water quality sampling and analysis of <br />Recycled Water produced by the Project, <br />9- Replacement of Project parts costing less than or equal to the following amount <br />per unit: <br />$100,000 x (ENRCCI / 6,694) <br />where ENRCCI is the Engineering News Record Construction Cost Index for Los <br />Angeles area for July of each applicable Fiscal Year. ENRCCI for July 1998 is <br />6,694. <br />h. Payments to Irvine Ranch Water District (IRWD) for Recycled Water service via <br />the Irvine Reclamation Project/Green Acres Project intertie during winter months, <br />Agreement 22156 -19- <br />
The URL can be used to link to this page
Your browser does not support the video tag.