My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WATER DISTRICT, ORANGE COUNTY (Green Acres Project Water) - 1988
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY OF
>
WATER DISTRICT, ORANGE COUNTY (Green Acres Project Water) - 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:58:48 AM
Creation date
9/19/2014 12:48:27 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10LIVII-1398 <br />ANNUALIZED REPLACEMENT COMPONENT <br />The Annualized Replacement Component shall be computed using Incurred costs for the <br />following., <br />a. Replacement cost of major Project parts costing more than the following amount <br />per unit. <br />$ 100,000 x (ENRCCI / 6,694) <br />where ENRCCI is the Engineering News Record Construction Cost Index for Los <br />Angeles area for July of each applicable Fiscal Year. ENRCCI for July 1998 is 6,694, <br />b. Salvage value of replaced parts shall be a negative replacement cost. <br />c. All contributions as outlined in Section 53 of this Agreement including but not <br />t� <br />limited to payments from IRWD to OCWD for wheeling water through the <br />Project, shall be treated as negative replacement cost values for the purpose of <br />computing the Annualized Replacement Component, <br />2. Costs of the following iterns shall not be used to calculate the Annualized Replacement <br />Component: <br />a. Replacement of any facilities beyond the Project's points of connection. <br />b. Any capital or operation and maintenance cost as previously defined in Exhibits B <br />and C, Annualized Capital Component and Operation and Maintenance <br />Component, respectively. <br />C. Reserve funds. <br />d. Intertie, pipeline between the Irvine Ranch Water District Reclamation <br />Project /Green Acres Project, <br />I The Annualized Replacement Cost (ARCost) shall be calculated using the same <br />procedure as for capital amortization ( ARCost) in Exhibit B except that: <br />• For membrane replacement, n is the number of years the replaced membranes were in <br />service; for all other replacement costs, n is 25 years. <br />• i is the interest rate in the Fiscal Year of replacement established in Section 3e of <br />Exhibit B. <br />• P is the actual costs of replacement in the Fiscal Year, subject to the adjustments cited <br />in Section 5 of Exhibit B. <br />4. The Annualized Replacement Component (ARCom) for each replacement occurrence in <br />dollars per acre-foot shall be calculated using the following procedure: <br />ARCom = ARCost / [(Deliveries to OCSD) + (Allowable Yield)] <br />Agreement 22156 -21- <br />
The URL can be used to link to this page
Your browser does not support the video tag.