My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BANNAOUN ENGINEERS CONSTRUCTION CORP.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
BANNAOUN ENGINEERS CONSTRUCTION CORP.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2016 2:15:17 PM
Creation date
9/22/2014 1:48:23 PM
Metadata
Fields
Template:
Contracts
Company Name
BANNAOUN ENGINEERS CONSTRUCTION CORP.
Contract #
15-6824
Agency
Public Works
Council Approval Date
9/2/2014
Destruction Year
2019
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />Project No. 15 -6824: 2014 -2015 Omnibus Concrete Replacement Contract <br />PROPOSAL & CONTRACT AGREEMENT <br />BID PROPOSAL, continued <br />Item # Bid Item Unit Quantity Unit Price <br />Amount <br />11. <br />Remove and Construct 8" PCC <br />SF <br />800 <br />$ /O oe ' <br />$ R'am w ` <br />Pavement <br />12. <br />Remove and Construct 12" PCC Bus <br />SF <br />3,400 <br />5'0 <br />$ 8 " <br />00 <br />$ 2A 1004 <br />Pad <br />13. <br />PCC Grinding <br />LF <br />150 <br />$ GS <br />$ 7 0 <br />14. <br />Root Shave <br />EA <br />100 <br />$ <br />$ 3,sba <br />15. <br />Paint Red Curb <br />LF <br />300 <br />$ 3 w <br />$ 6100' <br />16. <br />Remove and Construct Stamped <br />SF <br />300 <br />ao <br />$ /O – <br />ao <br />$ 73, Ofd ` <br />Concrete <br />17. <br />Remove and Construct Decorative <br />SF <br />300 <br />00 <br />$ /0 <br />$ 310ct>` <br />Sidewalk <br />18. <br />Remove and Construct Brick Pavers <br />SF <br />300 <br />$ 12— <br />$ 3,606- <br />19. <br />Furnish and Install Water Valve Box <br />EA <br />5 <br />$ �ZS6 <br />$ 2 /ZS�' <br />Frame and Cover to Grade <br />20. <br />Adjust Manhole Frame and Cover to <br />EA <br />5 <br />eo <br />$ 65'0 <br />w <br />$ 3, ZSO <br />Grade <br />21. <br />Adjust Pull Box to Grade <br />EA <br />10 <br />bo <br />$ 250 <br />on <br />$ 25 6-6 <br />22. <br />Furnish and Install No. 6 Pull Box <br />EA <br />10 <br />$ ( Oil <br />$ 9,000– <br />23. <br />Concrete Steel Filled Bollard (include <br />EA <br />16 <br />00 <br />$ 2– 5"b_ <br />-to <br />$ 4,CT)o <br />2 coats of paint) <br />24. <br />Install Concrete Bollards (Square) <br />EA <br />16 <br />ao <br />$ 0 <br />..v <br />$ 000v <br />25. <br />Furnish and Install Monument Tiles <br />EA <br />8 <br />00 <br />$ 3 p0— <br />w <br />$ Zi 40 <br />BP2of17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.