My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY WATER DISTRICT (3) - 2014
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY WATER DISTRICT (3) - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 3:58:38 PM
Creation date
9/30/2014 11:08:46 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY WATER DISTRICT
Contract #
A-2014-140
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
6/17/2014
Expiration Date
6/17/2017
Insurance Exp Date
10/1/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
za CL <br />4 LLJ <br />MEMORANDUM OF UNDERSTANDING <br />By and Between <br />THE ORANGE COUNTY WATER DISTRICT <br />And <br />THE CITY OF SANTA ANA <br />For <br />A- 2014 -140 <br />Revised 6/09/2014 <br />CONSTRUCTION AND OPERATION OF FOUR INJECTION WELLS, WATER <br />SUPPLY PIPELINE AND DISCHARGE PIPELINE AT CENTENNIAL PARK <br />WHEREAS, the construction and operation of four injection wells, water supply <br />pipeline and discharge pipeline (Project) at Centennial Park will serve the <br />interests of both the City of Santa Ana (CITY) and the Orange County Water <br />District (DISTRICT); and <br />WHEREAS, the City owns the property where the Project would be constructed <br />and operated; and <br />WHEREAS, CITY and DISTRICT wish to enter into this Memorandum of <br />Understanding ( "MOU ") as a basis for establishing permanent and temporary <br />easements on the property for the Project. <br />NOW, THEREFORE, the parties hereto establish the following principles to guide <br />their future negotiations on this matter: <br />1. Attached hereto as Exhibit 1 and incorporated by reference herein, is a <br />depiction showing the approximate location of the four injection wells and <br />water supply pipeline alignment proposed to be included in the proposed <br />easement area. The final configuration and size of the easements would <br />be based upon the final design of the well site locations and the alignment <br />of the water supply and discharge pipeline. <br />2. District will construct each injection well below grade and will be centered <br />in a parking stall. <br />3. District will require a 12- 15,000 square foot temporary work area at each <br />injection well for 1.5 months to accommodate drilling, followed by a 3,000 <br />square foot temporary work area at each injection well for 4.5 months to <br />construct the well. These areas are shown in Exhibit 2. <br />4. District will require 30 year easements for the well sites and pipeline <br />alignments. <br />5. District will coordinate with the City during construction to minimize <br />disruptions at Centennial Park. <br />
The URL can be used to link to this page
Your browser does not support the video tag.