Laserfiche WebLink
SeAnger Farmhouse and Orchard <br />Residentlal Development Project <br />CEQA Findings <br />impacts will still be less than significant with mitigation incorporated. (January 2014 <br />EIR Attachment, p. 4.) <br />3, Impact: Would the Project expose sensitive receptors to substantial pollutant <br />concentrations? <br />Finding: Less Than Significant, With Mitigation Incorporated, (EIR, p. 5 -10 through 5- <br />13.) <br />Analysis: The nearest sensitive receptors to the proposed project site are residential <br />communities located immediately adjacent to the project site to the north, south, and <br />west. To calculate localized significance, a worst -case, maximum construction <br />disturbance area of two acres per day was assumed, The closest residences were <br />determined to be 25 meters away, At this distance, it was determined that sensitive <br />receptors may be exposed to particulate matter in excess of SCAQMD's thresholds. <br />(EIR, p. 10, 5 -11, Table 5 -3.) As a result, this impact was considered potentially <br />significant. However, with the implementation of the following mitigation measures, this <br />impact is reduced to less than significant: <br />AIR -1: In order to reduce particulate matter emissions during project construction, <br />nontoxic soil stabilizers or comparable dust suppressant shall be applied to all inactive <br />construction areas (previously graded areas inactive for five consecutive days or more). <br />Chemical soil stabilizers, if used, shall be applied according to manufacturer's <br />specifications. <br />AIR -2: In order to reduce particulate matter emissions during construction, exposed <br />surfaces shall be watered three times a day. <br />AIR -3: In order to reduce localized impacts to sensitive receptors in the project vicinity <br />during construction, equipment staging areas will be positioned at least 300 feet away <br />from the sensitive receptors. <br />AIR -4: In order to reduce particulate matter emissions during construction, speeds on <br />unpaved roads will not exceed 15 miles per hour. <br />The incorporation of these measures will reduce exposure of sensitive receptors to <br />particulate matter. AIR -1, AIR -2, and AIR -4 will all reduce the amount of particulate <br />matter that enters into the air, while AIR -3 will ensure that areas with a higher propensity <br />to emit particulate matter are positioned a substantial distance away from sensitive <br />receptors. As a result, this impact is reduced to less than significant. (EIR, Table 5 -3, <br />compared to Table 5 -5.) Given that the project proposal analyzed in the Draft EIR <br />included development of 24 new single family residences, and the project as approved <br />will include development of only 22 new single family residences, it stands to reason that <br />with the reduced intensity of the project, impacts will still be less than significant with <br />mitigation incorporated. (January 2014 EIR Attachment, p. 4.) <br />C. BIOLOGICAL RESOURCES <br />24 "Exhibit A" <br />