My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23AA - PROJ - FLOWER ST BIKE TRAIL
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
10/21/2014
>
23AA - PROJ - FLOWER ST BIKE TRAIL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2014 5:23:54 PM
Creation date
10/16/2014 3:37:23 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23AA
Date
10/21/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Description: <br />Flower Street Bike Trail Gap Closure scope of work included the construction of a 10 -foot wide by <br />one -half mile long asphalt bicycle trail, landscaping, irrigation, security lighting, wrought iron <br />fencing and a trailhead plaza, with an art sculpture located at Flower Street and Sunflower Street, <br />J =I _ <br />MACARTHUR <br />laza <br />SUNFLOWER <br />EXHIBIT 1 <br />ST <br />saNrn ANA '9 I <br />PROJECT RPSTPLE 5063 (143) 12 -2620 <br />CITY COUNCIL ?.• <br />NI A : AGENDA DATe FLOWER STREET BIKE TRAIL GAP CLOSURE <br />JUNE 3, 2013 SUNFLOWER TO MACARTHUR <br />" " °"` °." l M1UKI PAGE 1 OF 1 <br />23AA -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.