Laserfiche WebLink
September 20, 2014 <br />Karen Haluza, AICP <br />Interim Executive Director <br />City of Santa Ana <br />Planning and Bullding Agency <br />20 Civic Center Plaza ā€” M20 <br />Santa Ana, CA 92702 <br />Subject: Scope and Budget Amendment I Harbor Corridor Plan & FIR I SNT -11 <br />Dear Ms. Haluza: <br />On September 16, 2014, the Santa Ana City Council conducted a public hearing to consider adoption of the Harbor <br />Corridor Plan and certification of the associated EIR. At that meeting, the City Council directed staff to revise the <br />specific plan and amend the FIR as necessary to allow 10 -story development in the Transit Node District, PlaceWorks <br />requests the following scope and budget amendment of $12,350 to prepare these changes and attend an additional <br />City Council hearing This amendment would cover all work done from September 1, 2014 onward. <br />1. FIR memo to address revisions to project, Including revised findings ($3,040) <br />Increased building height to 10 stories In one location and development caps. Memo will Identify revisions to the <br />project description and aesthetics analysis. The analysis will Incorporate new illustrations (provided under separate <br />task). This assumes that revisions would not result in any new significant impacts requiring recirculation. (new <br />significant impacts would require a change order). Includes one round of City revisions. <br />2. City Council hearing ($1,400) <br />Both the specific plan and FIR project managers will prepare for and attend additional City Council hearing to <br />adopt /cert'ifythe specific plan /EIR, <br />3, Specific Plan revisions to reflect Council changes ($4,870) <br />This Includes revisions to development standards (e,gā€ž building height, setback /separatlon, and permitted uses), <br />graphics and maps, as well as edits to the specific plan narrative and land use descriptions. Additionally, PlaceWorks <br />will augment the current Illustrations and show 10 -story buildings at one or both of the corners, stepping to 6 stories In <br />the background, This Includes the creation of an Initial sketch showing building form and urban relationships for city's <br />approval, followed by one -round of revisions, and a flnal colored Illustration. Finally, PlaceWorks will revise document <br />after City Council adoption and prepare Fl nal Speclflc Plan document. <br />4. Clean Final FIR ($3,040) <br />Following approval of the project by City Council, PlaceWorks will prepare a Final El consisting of all changes to the <br />Draft FIR based on the Response to Comments /FEIR, Memo, and revisions approved at City Council. The product Is a <br />clean FIR document that avoids the need to refer to both the Draft and Final FIR. <br />Please let me know if you have any questions or need additional Information. <br />Sincerely, <br />PIACEWORKS <br />Nicole Morse Colin Drukker <br />Associate Principal Associate Principal <br />S MacArthur Place, Suite 1100 1 Santa Ana, California 92707 1 714,966,9220 1 PlaceWorks.ccirn <br />25CC -6 <br />