My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25zII - AGMT - DESIGN BUILD SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
10/21/2014
>
25zII - AGMT - DESIGN BUILD SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2014 5:25:34 PM
Creation date
10/16/2014 4:03:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25II
Date
10/21/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
building and electrical permits from the Planning & Building Agency. There will be no fees <br />for these permits. <br />e. Fire Permits: All permits and fees required by all other Agencies having jurisdiction over any <br />part of the work shall be obtained and paid for by the Contractor, unless otherwise noted on the <br />Plans or in the Special Provisions. <br />1.16 CLEAN -UP & DUST CONTROL <br />This Section shall conform to Subsection 7 -8.1 of the Standard Specifications and these Special <br />Provisions. <br />The Contractor shall keep the work site clean and free from rubbish and debris at the end of every <br />working day. <br />In addition, the Contractor shall be fully responsible for removing any graffiti placed on new <br />improvements or Contractor's equipment daily immediately at the start of the work day. Cost to <br />remove graffiti shall be included in other items of work and no additional compensation will be <br />allowed therefore. <br />1.17 PUBLIC CONVENIENCE & SAFETY <br />This section shall conform to Subsection 7 -10 of the Standard Specifications and these special <br />provisions. <br />Local vehicular and pedestrian access, Including access to driveways and businesses, shall be <br />maintained at all times. <br />All signs shall be illuminated or reflectorized when they are used during hours of darkness. All <br />cones, pylons, barricades, or posts used in the diversion of traffic shall be refiectorized. <br />All signing, barricading and diversion of traffic shall be subject to the approval of the Project <br />Manager, The Contractor shall provide a telephone number at which the Contractor's <br />representatives can be reached should an emergency occur requiring replacement or relocation of <br />the required traffic devices. <br />Prior to the start of construction operations, the Contractor shall notify the Police and Fire <br />Departments of the City, giving the approximate starting date, completion date, and the name and <br />telephone number of responsible persons who may be contacted at any hour in the event of a <br />critical condition requiring immediate correction. <br />1.18 STATE DIVISION OF INDUSTRIAL SAFETY PERMITS <br />In accordance with Section 6600 of the State Labor Code, permits are required for all excavations, <br />which are five feet or deeper, or for all structures being built or demolished, which are more than <br />three stories high. <br />1.19 SUBCONTRACTING <br />This section shall conform to Section 2 -3.1 of the Standard Specifications and these Special <br />Provisions. <br />eFlr�nmmri <br />City of Santa Ana RFP 13 -064 <br />Page 16 <br />2511 -21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.