My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55CC - RESO - SEWER MAINT PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
10/21/2014
>
55CC - RESO - SEWER MAINT PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2014 5:43:56 PM
Creation date
10/16/2014 5:36:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55CC
Date
10/21/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of Santa Ana Section II: Sewer System Management Plan <br />by or under the direction of appropriately qualified professionals, and shall bear the professional(s)' <br />signature and stamp. <br />13. The mandatory elements of the SSMP are specified below. However, if the City believes that any <br />element of this section is not appropriate or applicable to the City's sanitary sewer system, the SSMP <br />program does not need to address that element. The City must justify why that element is not <br />applicable. The SSMP must be approved by the deadlines listed in Order No. 2006 - 0003 -DWQ. <br />Sewer System Management Plan (SSMP) <br />1. Goal <br />2. Organization <br />3. Legal Authority <br />4. Operation and Maintenance Program <br />5. Design and Performance Provisions <br />6. Overflow Emergency Response Plan <br />7. FOG Control Program <br />8. System Evaluation and Capacity Assurance Plan <br />9. Monitoring, Measurement and Program Modifications <br />10. SSMP Program Audits <br />11. Communication Program <br />14. Both the SSMP and the City's program to implement the SSMP must be certified by the City to be in <br />compliance with the requirements set forth above and must be presented to the City Council for <br />approval at a public meeting. The City shall certify that the SSMP, and subparts thereof, are in <br />compliance with the general WDRs within the time frames identified in the time schedule provided in <br />subsection D.15, below. <br />In order to complete this certification, the City's authorized representative must complete the <br />certification portion in the Online SSO Database Questionnaire by checking the appropriate milestone <br />box, printing and signing the automated form, and sending the form to: <br />State Water Resources Control Board <br />Division of Water Quality <br />Attn: SSO Program Manager <br />P.O. Box 100 <br />Sacramento, CA 95812 <br />The SSMP must be updated every five (5) years, and must include any significant program changes. <br />Re- certification by the Council of the City is required in accordance with D.14 when significant <br />updates to the SSMP are made. To complete the re- certification process, the City shall enter the data <br />in the Online SSO Database and mail the form to the State Water Board, as described above. <br />15. The City shall comply with these requirements according to the legislated schedule. This time <br />schedule does not supersede existing requirements or time schedules associated with other permits <br />or regulatory requirements. <br />April 2014 II -4 <br />55CC -15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.