My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HOUSTON HARRIS PCS, INC. 5 - 2014
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
HOUSTON HARRIS PCS, INC. 5 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2018 4:49:35 PM
Creation date
10/29/2014 1:13:18 PM
Metadata
Fields
Template:
Contracts
Company Name
HOUSTON HARRIS PCS, INC.
Contract #
A-2014-174
Agency
PUBLIC WORKS
Council Approval Date
7/15/2014
Expiration Date
6/30/2015
Insurance Exp Date
6/24/2016
Destruction Year
2021
Notes
Amended by A-2014-174-01, -02
Document Relationships
HOUSTON HARRIS PCS, INC. 5A - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
HOUSTON HARRIS PCS, INC. 5B - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
directed by the City. No adjustment in cost shall be allowed for night work. Notwithstanding, the <br />Contractor shall always use whatever mechanical means are available, including modification or changing <br />of the camera wheels or treads, to insure that the image is recorded in an upright, unrotated position. The <br />City reserves the tight to reject any video where changes in the orientation of the camera could have been <br />corrected by such modifications or by performing the work during periods of low flow. <br />2$. Traffic control for sanitary sewer inspection shall be the responsibility of the contractor and shalt <br />conform to the work Area Traffic Control Handbook (WATCH). Flashing arrow boards shall be used on <br />arterial streets. <br />26. Within two (2) working days after being notified to inspect a particular section of sewer main, the <br />contractor shall begin CCTV inspection, and shall diligently pursue that work to completion. <br />The Contractor shall perform all sewer manhole assessment inspections services per NASSCO standards <br />by the Manhole Assessment Certification Program (MACP) Level I. Level I (MACP) shall include all <br />information included on Level I (MACP) detailed therein in addition to the, using valid MACP defect <br />codes, <br />27. The contractor shall be an independent contractor capable of providing experienced, knowledgeable <br />and professional staff. The contractor shall be responsive and maintain excellent working relationships <br />with city residents, businesses, government officials olid City staff. The contractor shall provide adequate <br />staffing levels at all times and adhere to established schedules. <br />All vehicles and or towed equipment shall can -y "City of Santa Ana Authorized Contractor" magnet sign <br />affixed and visible. The contractor shall comply with all federal, state and local laws, rules, regulations, <br />ordinances, and statutes, including but not limited to these contract documents. <br />13 <br />25E-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.