My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
W.A. RASIC CONSTRUCTION COMPANY, INC.-2014
Clerk
>
Contracts / Agreements
>
W
>
W.A. RASIC CONSTRUCTION COMPANY, INC.-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2014 3:19:19 PM
Creation date
10/30/2014 3:09:25 PM
Metadata
Fields
Template:
Contracts
Company Name
W.A. RASIC CONSTRUCTION COMPANY, INC.
Contract #
A-2014-228
Agency
PUBLIC WORKS
Council Approval Date
9/16/2014
Expiration Date
9/11/2017
Insurance Exp Date
5/1/2015
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C PQB 'L 74-044 <br />EJCY SEWER AND WATER REPAIRS <br />Tvnicul Ememencv Response Procedure <br />As explained in our Qualifications Statement, W.A. Rasic Construction maintains a large fleet of <br />company owned equipment and employs a large number of skilled professionals. We intend to <br />fully service the City of Santa Ana, as we have previously, by handling your entire scope of <br />emergency needs quickly, efficiently, and safely. <br />If awarded the contract for On -Call Services, W.A. Rasic would provide the City with a list of <br />personnel to call that are available on a 24 -hour, 7 -day a week basis. Once a call is received <br />from the City for an emergency, it immediately becomes our emergency. Our emergency action <br />plan is activated and people immediately begin working toward resolving the City's problem. <br />A superintendent is immediately contacted and assigned as point. Calls are then made to our <br />Dispatcher to assist in contacting employees, equipment rental companies if necessary, and key <br />suppliers. Multiple simultaneous calls are made. The superintendent or foreman immediately <br />begins driving to the location of the emergency for immediate assessment of resource needs. He <br />or she conferences with the City's onsite representative to make sure they are on the same page. <br />Calls are made to adjust necessary resources so that costs are minimized. Assessment of site <br />safety is the first order of business, appropriate vehicle and pedestrian control is considered, and <br />then excavation safety. <br />Equipment, employees, and materials begin arriving on the jobsite in short order. Safety is <br />reviewed and then the tasks and method of repair. Then the crew begins immediately working to <br />resolve the emergency. <br />After the emergency has been resolved, W.A. Rasic Construction field crews work with the <br />governing agency to ensure the job site is restored to existing or better condition, and is cleaned <br />up to the satisfaction of the agency. <br />Relevant Project Examples <br />A Recent Example of a Typical Emergency Response: On Sunday, July 20, 2014 at 1 AM W.A. <br />Rasic Construction responded to an emergency call for Golden State Water Company. A 6 -inch <br />DIP water main had burst in Los Angeles. Our after -hours emergency response plan was <br />initiated by our superintendent. A crew was immediately contacted and dispatched to the site. <br />Our dispatch yard quickly sent out the necessary equipment and materials for the repair. The <br />traffic control was setup, the line was excavated and shored, the leaks identified and the pipe <br />replaced, tested, and put back into service. The area was backfilled, paved, and the roadway <br />N ` cleaned up. <br />;Typical Emergency Response Project: On Wednesday, July 16, <br />n responded to an emergency leak for the Inland Empire Utilities <br />io Desalter II plant. A caustic soda line was discovered leaking in <br />e trench. W.A. Rasic Construction mobilized to the site and <br />
The URL can be used to link to this page
Your browser does not support the video tag.