Laserfiche WebLink
CEQA Consulting Services —Walnut Pump Station Building <br />EXHIBIT A: SCOPE OF WORK <br />document. The substance of the MND will be the Initial Study, accompanied by additional documentation that <br />includes a detailed description of the proposed project and discusses: 1) the requirements of CEQA; 2) the <br />primary purpose of a MND; 3) the standards for adequacy for a MND pursuant to the State CEQA Guidelines; 4) <br />the format and content of the MND; and 5) the City's processing requirements to consider the proposed project <br />and MND for approval. T&B Planning will submit the draft MND to the City for review and approval. The budget <br />for this task assumes a single round of revisions to the MND to Incorporate a modest to minor set of comments <br />from the City and/or its legal counsel. The need for extensive revisions Is not anticipated or budgeted for in this <br />proposal. <br />Upon receiving the City's authorization to finalize the Initial Study and MND (IS/MND), T&B Planning will prepare <br />and print one (1) "photo ready" set of originals of the Initial Study and MND one (1) CD of the MND and any <br />associated technical reports. For purposes of this proposal, it is assumed that the City of Santa Ana will be <br />responsible for producing all hard copies and/or CDs of the IS/MND document that will be distributed for public <br />review, <br />TASI{ 6: CIRCULATE INITIAL STUDY AND MITIGATED NEGATI'.'VE DECLA'RATI'ON <br />T&B Planning will prepare the Notice of Intent (N01) to Adopt a MND and the Notice of Completion (NOC) <br />required for the Initial Study and MND's 30 -day public review period, Pursuant to CEOA, requirements, the N01 <br />will include a brief description of the project and its location; starting and ending dates of the public review <br />period; date, time, and place of public meetings or hearings to consider the project (if known at the time of <br />notice); address where copies of the IS/MND are available for review; and disclosure if the project site Is on any <br />lists enumerated under Section 65962.5 of the Government Code (hazardous waste sites). The NOC form will be <br />obtained from the State Clearinghouse website. One (1) electronic copy each of the NOI and NOC will be <br />provided to the City. <br />T&B Planning will work with City staff to ensure that the N01, NOC, and IS/MND are properly distributed for <br />public review and meet CEQA distribution procedural requirements. For this project, noticing will need to occur <br />as follows: <br />• The N01 will be mailed to responsible agencies, trustee agencies, and the Orange County Clerk, as <br />well as all organizations and individuals who previously requested notice (CEQA Guidelines Section <br />15072(a) & (b)); and <br />The N01 will be publically advertised In at least one of the following ways: 1) publication in a <br />newspaper of general circulation in the area affected by the project; 2) posting of notice on and off- <br />site in an area where the project is to be located; and/or 3) direct mailing to owners and occupants <br />of contiguous property shown on the latest equalized assessment roll (CEQA Guidelines 15072(b)1- <br />3). <br />This proposal assumes that the City will compile the distribution list and provide mailing labels for the <br />Walnut Pump Station April 26, 2013 <br />T&B Planning, Inc. <br />Page 3 of 8 <br />